Laserfiche WebLink
Addendum #2 <br />Date: September 8, 2022 <br />To: All Bidders and others to whom Plans & Specifications have been issued <br />From: Kil Architecture/ Planning <br />Gregory A. Kil, AIA, NCARB <br />Architect <br />RE: Wastewater Treatment Plant Compressor Building Masonry Improvements <br />Project 121-046 <br />City of South Bend, Indiana, Board of Public Works <br />County -City Building, Room 1316 <br />227 West Jefferson Blvd. <br />South Bend, IN 46601 <br />This addendum forms part of the Contract Documents and modifies the original Bidding Documents only <br />as noted below. The remainder of the drawings and Specifications are to remain in their entirety. <br />Acknowledge receipt of this addendum in the space provided on the Bid Form. This addendum consists <br />of the following changes identified in bold: <br />DRAWINGS: <br />A. Drawings A2.1, A2.2, A2.3, & A2.4 ELEVATIONS <br />1. General Note 7, Add to end of note the following: <br />" CLEANING IS TO BE LIMITED TO EXTERIOR WALLS, AND DOES NOT <br />INCLUDE INTERIORS NOR GARAGE 0507." <br />2. Elevation Keynote #9, Add to end of note the following: <br />" DOES NOT APPLY TO LOWER LINTEL AT CURVED GLASS BLOCK WALL <br />IN STAIR 0518, ONLY TO TOP LINTEL IN THIS LOCATION." <br />B. Drawing A4.1 DETAILS <br />1. Detail #1 Note: Replace Note: " <br />WOOD TRIM W/ METAL FACING TO BE PROTECTED & REMAIN IN PLACE. REPAIR <br />AS NECESSARY" with: <br />"AT GLASS BLOCK, REMOVE AND PROTECT INTERIOR METAL AND WOOD TRIM <br />IN ORDER TO DO LINTEL WORK, AND REINSTALL TRIM AFTER LINTEL WORK IS <br />COMPLETE." <br />END OF ADDENDUM #2 <br />K I L <br />ARCHITECTURE <br />PLANNING <br />www.kilarchilecture.com <br />Addendum #2 <br />Page 1 of I <br />1126 LINCOLNWAY EAST SOUTH BEND I N 46601 (574) 288.2654 VOICE 289. 2420 FA X <br />