My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - WWTP Compressor Building Masonry Improvements Proj No. 121-046 - Slatile Roofing & Sheet Metal
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2022
>
Opening of Bids
>
Opening of Bids - WWTP Compressor Building Masonry Improvements Proj No. 121-046 - Slatile Roofing & Sheet Metal
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2022 1:45:30 PM
Creation date
9/13/2022 1:44:51 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/13/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BID/PROPOSAL <br />CITY OF SOUTH BEND <br />Project Name: Wastewater Treatment Plant Masonry Improvements at Building 5 !" <br />Project Number: 121-046 <br />For Bids Due: September 13, 2022 <br />Contractor Name: Slatile Roofing & Sheet Metal Co., Inc. <br />BASE BID <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />3 <br />Masonry Improvements for Building #5: <br />$25 <br />6 <br />Brick Replacement <br />4 <br />Masonry scope includes brick masonry <br />1 <br />LS <br />Glass Block Replacement <br />$8,500.00 <br />1 <br />repointing (1200sf), brick replacement <br />(1,000 units), glass block replacement <br />1 <br />LS <br />per sf <br />` <br />(130 units), limestone replacement (140 <br />22'-0" Steel Lintel Replacement <br />per unit <br />3 'J U� <br />sf), complete cleaning of exterior of brick <br />and stone masonry surfaces, <br />2 <br />Construction Contingency Allowance <br />1 <br />LS <br />$10,000.00 <br />$10,000.00 <br />BASE BID TOTAL <br />ALTERNATE #1 <br />Item <br />No. <br />Description <br />p <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />3 <br />Replacement of stud wall with CMU <br />$25 <br />6 <br />Brick Replacement <br />4 <br />block infill between rooms 500 and 504 <br />1 <br />LS <br />Glass Block Replacement <br />$8,500.00 <br />ALTERNATE #2 <br />ALTERNATE #1 TOT� 8 , 5 0 0� <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />Brick Masonry Repointing <br />Prepare existing concrete floor slab for <br />$25 <br />6 <br />Brick Replacement <br />4 <br />an install new epoxy floor coating for <br />7 <br />Glass Block Replacement <br />per unit <br />$80 <br />mezzanine 0517 <br />8 <br />Limestone Replacement <br />per sf <br />$9,000.00 <br />ALTERNATE #2 TOTAL < ' C)()O < TO <br />UNIT PRICING <br />Item <br />No. <br />Description <br />Unit <br />Add <br />Deduct <br />5 <br />Brick Masonry Repointing <br />per sf <br />$25 <br />6 <br />Brick Replacement <br />per unit <br />$30 <br />7 <br />Glass Block Replacement <br />per unit <br />$80 <br />8 <br />Limestone Replacement <br />per sf <br />$30 <br />9 <br />22'-0" Steel Lintel Replacement <br />per unit <br />3 'J U� <br />The City of South Bend will review the Base Bid and any combination of Alternate #1, Alternate <br />#2 and Unit Pricing Values in its evaluation of pricing to determining the lowest, responsive, <br />responsible bidder. The City of South Bend shall be the sole judge in awarding the Base Bid <br />work plus any combination of the Alternates and Unit Price work, in whole or in part, based on <br />available funding for the project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.