My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bill No. 29-22 Passed & Signed
sbend
>
Public
>
Common Council
>
Legislation
>
Upcoming Bills
>
2022
>
06-27-2022
>
Bill No. 29-22 Passed & Signed
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2022 9:43:51 AM
Creation date
8/25/2022 9:43:51 AM
Metadata
Fields
Template:
City Council - City Clerk
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
(5) Residential unit is any single-metered free-standing independent structure primarily used as a <br /> dwelling unit for one household. <br /> (6) System Development Charge("SDC') is the cost charged by the City to ensure that its water <br /> and sewer facilities are able to support development and to meet future capacity demand. <br /> An SDC is charged upon the connection of new customers to the City's water or sewer <br /> utilities and new uses by existing customers that would materially change the demands on <br /> the water and/or sewer utility. <br /> Sec. 17-7-9 79.1. System Development Charge for Wastewater inside and outside City limits. <br /> (I) - - -. --- - - • •- . -• - . . . . . - '. . <br /> - . ! - -- - - e <br /> fiery. No customer will be less than one (1) ERU. There will be no partial ERU's. <br /> The City shall round down to the closest applicable ERU calculation at all times. <br /> (2) - : • . . •- _ . . - - - . -,€er For every new connection <br /> to the South Bend Municipal Sewer Works, a system development charge of one thousand <br /> one hundred forty-five dollars($1,145.00) shall be collected per ERU <br /> thereof to be connected. All charges shall be billed by the City at the time the application <br /> for service is filed. <br /> ( ) - .. - - • - - - - - _ . .. <br /> - ' . For all ether non-residential types <br /> of structures, the ERU calculation shall be based upon the ratio of overage Daily Flow <br /> water and sewer use values provided in 327 IAC 3-6-11 in <br /> divided by three hundred ten (310) gallons per day. For structures not listed <br /> in 327 IAC 3-6-11, the ERU shall be calculated as the relationship between the Average <br /> Daily Flow reported in the sewer capacity certification for the structure and three hundred <br /> iiien ten(310)gallons per day. described in the Board of Works Resolution No. 20-2017. <br /> For mixed use structures, which include residential and non-residential units, the ERU <br /> calculation shall be based on the addition of the number of residential units and the water <br /> and sewer use values provided in 327 IAC 3-6-11 for the non-residential units. <br /> (4) For parcels with an existing connection to City sewer seeking to redevelop the property, a <br /> System Development Charge will be collected if the redevelopment necessitates a larger water <br /> meter size to accommodate increased flow. The System Development Charge will be <br /> calculated using meter size equivalency factors shown below. The difference between the <br /> existing meter size equivalency factor and new meter size equivalency factor will be collected. <br /> For example, if the existing development on a parcel has a 5/8 in meter, and the new <br /> development will require a 1 in meter, the SDC will be $2,863 (SDC for 1 in) - $1,145 (SDC <br /> for 5/8 in) = $1,718. There will not be a credit given if the meter size is reduced. Existing <br /> water tap size will be used if the meter is not available. Upon application for connection, the <br /> new meter size will need to be determined. <br />
The URL can be used to link to this page
Your browser does not support the video tag.