My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Inspection Services for Beck’s Lake LaSalle Park – Jones Petrie Rafinski Corporation
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2022
>
Agreements/Contracts/Proposals/Addenda
>
PSA - Inspection Services for Beck’s Lake LaSalle Park – Jones Petrie Rafinski Corporation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2022 1:35:41 PM
Creation date
8/23/2022 1:35:09 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
8/23/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Exhibit A – Engineer’s Services <br />EJCDC® E-500, Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2014 National Society of Professional Engineers, American Council of Engineering Companies, <br /> and Amer ican Society of Civil Engineers. All rights reserved. Page 13 <br />e. Accompany visiting inspectors representing public or other agencies having <br />jurisdiction over the Work, record the results of these inspections, and report to <br />Engineer. <br />12. Records <br />a. Maintain orderly files for correspondence, reports of job conferences, copies of <br />Construction Contract Documents including all Change Proposals, Change Orders, <br />Field Orders, Work Change Directives, Addenda, additional Drawings issued <br />subsequent to the execution of the Construction Contract, RFIs, Engineer's <br />clarifications and interpretations of the Construction Contract Documents, progress <br />reports, approved Shop Drawing and Sample submittals, and other Project-related <br />documents. <br />b. Prepare a daily report or keep a diary or log book, recording Contractor's hours on <br />the Site, Subcontractors present at the Site, weather conditions, data relative to <br />questions of Change Proposals, Change Orders, Field Orders, Work Change <br />Directives, or changed conditions, Site visitors, deliveries of equipment or materials, <br />daily activities, decisions, observations in general, and specific observations in more <br />detail as in the case of observing test procedures; and send copies to Engineer. <br />c. Upon request from Owner to Engineer, photograph or video Work in progress or <br />Site conditions. <br />d. Record and maintain accurate, up-to-date lists of the company names and points of <br />contact for Contractors, Subcontractors, and major Suppliers of materials and <br />equipment. <br />e. Maintain records for use in preparing Project documentation. <br />f. Upon completion of the Work, furnish original set of all RPR Project documentation <br />to designated recipients. <br />13. Reports <br />a. Furnish periodic reports as required of progress of the Work and of Contractor's <br />compliance with the progress schedule and schedule of Shop Drawing and Sample <br />submittals. <br />b. Draft responses to or make recommends on Change Proposals, Change Orders, <br />Work Change Directives, and Field Orders. Obtain backup material from Contractor. <br />c. Furnish to Engineer and Owner copies of all inspection, test, and system start-up <br />reports. <br />d. Immediately inform appropriate parties of the occurrence of any Site accidents, <br />emergencies, natural catastrophes endangering the Work, possible force majeure <br />or delay events, damage to property by fire or other causes, or the discovery of any <br />potential differing site condition or Constituent of Concern.
The URL can be used to link to this page
Your browser does not support the video tag.