My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Inspection Services for Beck’s Lake LaSalle Park – Jones Petrie Rafinski Corporation
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2022
>
Agreements/Contracts/Proposals/Addenda
>
PSA - Inspection Services for Beck’s Lake LaSalle Park – Jones Petrie Rafinski Corporation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2022 1:35:41 PM
Creation date
8/23/2022 1:35:09 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
8/23/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />EJCDC® E-500, Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2014 National Society of Professional Engineers, American Council of Engineering Companies, <br /> and American Society of Civil Engineers. All rights reserved. Page <br />7 <br />B. Owner shall procure and maintain insurance as set forth in Exhibit G. Owner shall cause <br />Engineer and its Consultants to be listed as additional insureds on any general liability <br />policies carried by Owner, which are applicable to the Project. <br />C. Owner shall require Contractor to purchase and maintain policies of insurance covering <br />workers' compensation, general liability, motor vehicle damage and injuries, and other <br />insurance necessary to protect Owner's and Engineer's interests in the Project. Owner <br />shall require Contractor to cause Engineer and its Consultants to be listed as additional <br />insureds with respect to such liability insurance purchased and maintained by Contractor <br />for the Project. <br />D. Owner and Engineer shall each deliver to the other certificates of insurance evidencing the <br />coverages indicated in Exhibit G. Such certificates shall be furnished prior to <br />commencement of Engineer’s services and at renewals thereafter during the life of the <br />Agreement. <br />E. All policies of property insurance relating to the Project, including but not limited to any <br />builder’s risk policy, shall allow for waiver of subrogation rights and contain provisions to <br />the effect that in the event of payment of any loss or damage the insurers will have no <br />rights of recovery against any insured thereunder or against Engineer or its Consultants. <br />Owner and Engineer waive all rights against each other, Contractor, the Consultants, and <br />the respective officers, directors, members, partners, employees, agents, consultants, and <br />subcontractors of each and any of them, for all losses and damages caused by, arising out <br />of, or resulting from any of the perils or causes of loss covered by any builder’s risk policy <br />and any other property insurance relating to the Project. Owner and Engineer shall take <br />appropriate measures in other Project-related contracts to secure waivers of rights <br />consistent with those set forth in this paragraph. <br />F. All policies of insurance shall contain a provision or endorsement that the coverage <br />afforded will not be canceled or reduced in limits by endorsement, and that renewal will <br />not be refused, until at least 10 days prior written notice has been given to the primary <br />insured. Upon receipt of such notice, the receiving party shall promptly forward a copy of <br />the notice to the other party to this Agreement. <br />G. At any time, Owner may request that Engineer or its Consultants, at Owner’s sole expense, <br />provide additional insurance coverage, increased limits, or revised deductibles that are <br />more protective than those specified in Exhibit G. If so requested by Owner, and if <br />commercially available, Engineer shall obtain and shall require its Consultants to obtain <br />such additional insurance coverage, different limits, or revised deductibles for such <br />periods of time as requested by Owner, and Exhibit G will be supplemented to incorporate <br />these requirements. <br />6.05 Suspension and Termination <br />A. Suspension: <br />1. By Owner: Owner may suspend the Project for up to 90 days upon seven days written <br />notice to Engineer.
The URL can be used to link to this page
Your browser does not support the video tag.