My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposal - Coal Line Trail, Phase IIB (CE Services) Proj No. 122-035 - HWC Engineering
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2022
>
Opening of Quotations/Proposals
>
Opening of Proposal - Coal Line Trail, Phase IIB (CE Services) Proj No. 122-035 - HWC Engineering
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2022 1:30:08 PM
Creation date
8/23/2022 1:29:47 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
8/23/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TEAM PROJECT APPROACH RELEVANT EXPERIENCE 4FIRM OVERVIEWCITY OF SOUTH BEND | CE Services for Coal Line Trail Phase IIB (Des # 2200199) <br />Scott Carter <br />SENIOR RESIDENT PROJECT REPRESENTATIVE <br />PROJECT TEAM <br />CERTIFICATIONS: <br />• Stormwater Level 1 <br />• SiteManager Certified <br />• INDOT Certified Highway Technician and Project <br />Engineer/Supervisor <br />• 10 Hour OSHA <br />• National Highway Institute Certifications <br /> -Maintenance of Traffic for Supervisors <br /> -Proper Joint Sealing Techniques for Pavement <br />Preservation <br />QUALIFICATIONS: <br />Scott has more than 23 years of experience in the construction industry performing <br />inspection services on a variety of project types. He is experienced in inspecting <br />construction crews, work, and materials for compliance with State specifications. Scott is a <br />proud Army veteran and is familiar with working in the South Bend area as he is currently <br />working on the inspection of Olive Street Phase 2. <br />*Previous Employer <br />SCOTT <br />will be able to <br />commit <br />100% <br />to this project. <br />OF HIS <br />TIME <br />PROJECT EXPERIENCE <br />• Construction Inspection Services for Intersection Safety Project (Des # 1702829) - La Porte <br />County, IN <br />• Inspection of Olive Street Phase 2 Road Improvements at Railroad Crossing (Des # 1902178) - <br />South Bend, IN <br />• ADA Upgrades and Resurfacing of SR 15 (R-40475) - Silver Lake, IN* <br />• Inspection of Two Projects, Replace Approaches and Microsilica Bridge Deck Overlay and Thin <br />Deck Overlay (B-41074) - Elkhart County, IN* <br />• Inspection of a Series of Projects: Bridge Deck Replacement and Widening, Three CIPP Air- <br />Inversion Steam Cure Pipe Liners, and Culvert Removal and Replacement (R-41079) - Various <br />Counties, IN* <br />• Roundabout at SR 13/CR 33/US 6 Intersection - Elkhart County, IN* <br />• Rerouting US 33 Over Railroad Tracks, Lincoln Ave, and Cottage Avenue - Goshen, IN* <br />DID YOU KNOW.... <br />Scott Carter served as an INDOT employee <br />for most of his career.
The URL can be used to link to this page
Your browser does not support the video tag.