Laserfiche WebLink
TEAM PROJECT APPROACH RELEVANT EXPERIENCE 11FIRM OVERVIEWCITY OF SOUTH BEND | CE Services for Coal Line Trail Phase IIB (Des # 2200199) <br />HWC was responsible for the full-time inspection of the Interurban Deer Creek <br />Trail project located along Deer Creek from Hamilton Street to US 421 in Delphi, <br />Indiana. <br />This project included construction of new sidewalk, curb/gutter, PCCP driveways, <br />and drainage structures between Wabash Street and US 421. New terrain <br />construction between Hamilton Street and Wabash Street requiring earth <br />embankment fill and subgrade treatment was also performed before finishing the <br />trail with full depth HMA pavement. <br />This project was funded by INDOT and the City of Delphi with a total project cost of <br />just under $280,000. <br />HWC completed the Washington Street Gateway & Trail project in Delphi, Indiana. <br />The project included installation of a multi-use path with period street lighting, <br />handicap-accessible ramps, brick paver accents, site furnishings, wayfinding, and <br />landscape areas. <br />The multi-use path created critical connections between schools, historic <br />neighborhoods, and other points of interest in the community. <br />Federal aid funding was utilized for this project, which served to create a <br />pedestrian-friendly downtown. <br />The project was funded by INDOT and the City of Delphi. Total project cost was <br />$1.5 million. <br />Washington Street Gateway Trail Phase IIInterurban Deer Creek Trail <br />RELEVANT EXPERIENCE: HWC <br />DELPHI, IN DELPHI, IN