My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposal - Coal Line Trail, Phase IIB (CE Services) Proj No. 122-035 - A&Z Engineering LLC
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2022
>
Opening of Quotations/Proposals
>
Opening of Proposal - Coal Line Trail, Phase IIB (CE Services) Proj No. 122-035 - A&Z Engineering LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2022 1:29:39 PM
Creation date
8/23/2022 1:29:25 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
8/23/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SOUTH BEND CE SERVICES: COAL LINE TRAIL PHASE IIB DES #2200199 9 <br />A&Z Engineering: Key Staff Project Assignments <br />Coming together is the beginning. Staying together is progress. Working together is success. <br />A&Z Engineering, LLC stands out from most other firms due to the volume of qualified, experienced RPR’s and Inspectors on staff.Due to their close proximity to the job <br />site, we have strategically designated 5 key staff members from A&Z and McCormick Engineering to work solely on this project;however, A&Z has the capacity to offer 14 <br />additional support staff members that are certified RPR’s and Inspectors. Life happens, and we’re prepared to ensure the safe, expedient progress of this and all projects <br />for which we submit proposals. <br />Budget Capacity Team Capacity <br />McCormick Engineering and A&Z Engineering have the staff capacity to dedicate their time and <br />effort to Coal Line Trail Phase IIB and are looking forward to partnering for the project. <br />Mark Voss: PM, RPR Matt Curry: RPR Jason Pace: RPR, <br />Inspector <br />Fall ’23 <br />Summer ’23 <br />Spring ’23 <br />Winter ’22-’23 <br />Fall ’22 <br />Summer ‘22 <br />Bridge Painting| DES #2001070; #2001073; # 2001074Bridge Painting| DES #2001070; #2001073; # 2001074Bridge Painting| DES #2001070; #2001073; # 2001074PROJECT CAPACITY <br />McCormick Engineering: Key Staff Project Assignments <br />Jeff Beer: <br />Inspector <br />Tracy McCormick, <br />P.E.: Inspector <br />Aug ’22 Sept ’22 Oct’22 Nov ’22 Dec ’22 Jan ‘23 <br />Finishing up Open Projects Ready for work on Coal <br />Line Trail Phase IIBCoal Line Trail Phase IIB | DES #2200199Coal Line Trail Phase IIB | DES #2200199Coal Line Trail Phase IIB | DES #2200199I have worked with A&Z on a number of Federal Aid LPA <br />Projects. …attention to detail and constant <br />communication with me during those projects has made <br />my job negotiating the paperwork and bureaucracy much, <br />much easier.I have great confidence in A&Z’s abilities. <br />Scott Derby <br />Department of Engineering Manager, Kendallville <br />Covington Trail | Fort Wayne, INHeritage Trail | Winona Lake, IN <br />A&Z has the capacity to handle inspection work totaling $300,000 each <br />quarter.
The URL can be used to link to this page
Your browser does not support the video tag.