Laserfiche WebLink
BID/PROPOSAL <br />CITY OF SOUTH BEND <br />Addendum no. 1 <br />PROJECT NAME: South Bend Neighborhood Infrastructure Project - Riverside Dr & Leland <br />PROJECT NO. 121-048A <br />FOR BIDS DUE: August 23, 2022 <br />CONTRACTOR NAME: Milestone Contractors North, Inc. <br />.y <br />_ a <br />Base Bid <br />Item No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1. <br />Construction Engineering <br />1 <br />LS <br />13,638.00 <br />$13,638.00 <br />2. <br />Mobilization/Demobilization <br />1 <br />LS <br />77,000.00 <br />$77,000.00 <br />3. <br />Maintenance of Traffic <br />1 <br />LS <br />27,150.00 <br />$27,150.00 <br />4. <br />Erosion Control <br />1 <br />LS <br />1,900.00 <br />$1,900.00 <br />5. <br />Clearing R/W <br />1 <br />LS <br />25,000.00 <br />$25,000.00 <br />6. <br />Pavement Milling, 3" <br />4,600 <br />SYD <br />7.00 <br />$32,200.00 <br />7. <br />Curb, Concrete, Remove <br />710 <br />LFT <br />33.00 <br />$23,430.00 <br />8. <br />Concrete Pavement, Sidewalk, Remove <br />515 <br />SYD <br />33.00 <br />$16,995.00 <br />9. <br />Remove Structure <br />9 <br />EA <br />600.00 <br />$5,400.00 <br />10. <br />Remove Pipe <br />155 <br />LFT <br />38.00 <br />$5,890.00 <br />11. <br />Common Excavation <br />1,435 <br />CYD <br />68.00 <br />$97,580.00 <br />12. <br />B Borrow <br />400 <br />CYD <br />90.00 <br />$36,000.00 <br />13. <br />Structure Backfill <br />110 <br />CYD <br />11.00 <br />$1,210.00 <br />14. <br />Compacted Aggregate, No. 53 <br />560 <br />TON <br />46.00 <br />$25,760.00 <br />15. <br />HMA Surface, 9.5 mm, Type B <br />535 <br />TON <br />148.00 <br />$79,180.00 <br />16. <br />HMA Intermediate, 19.0 mm, Type B <br />235 <br />TON <br />140.00 <br />$32,900.00 <br />17. <br />HMA Base, 25.0 mm, Type B <br />375 <br />TON <br />106.00 <br />$39,750.00 <br />18. <br />Asphalt for Tack Coat <br />4 <br />TON <br />1.00 <br />$4.00 <br />19. <br />Joint Adhesive <br />4,000 <br />LFT <br />0.01 <br />$40.00 <br />20. <br />Liquid Asphalt Sealant <br />2,000 <br />LFT <br />0.01 <br />$20.00 <br />21. <br />Concrete Curb, 6" <br />755 <br />LFT <br />130.00 <br />$98,150.00 <br />22. <br />Concrete Header <br />35 <br />LFT <br />210.00 <br />$7,350.00 <br />23. <br />Concrete Approach, 6" <br />190 <br />SYD <br />175.00 <br />$33,250.00 <br />24. <br />Concrete Sidewalk, 4" <br />340 <br />SYD <br />175.00 <br />$59,500.00 <br />25. <br />Concrete Curb Ramp and Detectable Warning Surface <br />140 <br />SYD <br />175.00 <br />$24,500.00 <br />26. <br />Sodding <br />1,030 <br />SYD <br />20.40 <br />$21,012.00 <br />Version 09/29/2021 Contractor's Bid for Public Works - 7 <br />