Laserfiche WebLink
Resurrect the Roses, Inc. <br />July 18, 2022 <br />Re: Rose Garden Stairway to Nowhere <br />Meeting of June, 13, 2022 <br />Aaron; <br />I wanted to set out an update from our discussion at your office: <br />After our meeting of June 13, at which we discussed this project, I met with Adam Toering at <br />HPC on June 16 at his office, and reviewed the project with him. He indicated that he was in <br />favor of both this stairway project, and the water feature project that I have proposed for <br />Spring, 2023. <br />He indicated that he would give administrative approval for both projects, without the need for <br />full Board approval/review by HPC. <br />He advised me to submit a written proposal and basic drawing to him, signed off by VPA, and <br />he would approve it. <br />On June 16th, I also met on site with David Evans, of Evans Metal and reviewed the handrail part <br />of this project. He took all of the necessary measurements, and will provide me with a bid for <br />the handrails for the steps, identical to what they installed on the steps in Leeper Park (West), <br />going down into the Fountain area. Adam has indicated that this style will be acceptable to him <br />and HPC. Mr. Evans will be submitting a bid to me. <br />In addition, I met this morning with Brad, from VPA, to look at the electrical needs for the water <br />feature, on site. Brad was very helpful, and will be talking to the electrician about these <br />requirements. <br />I am attaching the proposal to HPC on the small staircase project, and would appreciate it if you <br />would approve it, and either return it to me; or pass it on to Adam for his approval. <br />Sincer <br />Larry S <br />