My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Engineering Services for SBCSC – American Structurepoint, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2022
>
Agreements/Contracts/Proposals/Addenda
>
PSA - Engineering Services for SBCSC – American Structurepoint, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2022 2:29:19 PM
Creation date
8/9/2022 2:28:59 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
8/9/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2019.02814 <br />February 22, 2022 <br />July 25, 2022 <br />Mr. Jitin Kain, AICP <br />Deputy Director – Department of Public Works <br />City of South Bend <br />227 W. Jefferson Boulevard, Suite 1316 <br />South Bend, Indiana 46601 <br />Re: 3D Laser Scanning and Modeling services, Parking Assessment, and Space Planning Design <br />Services <br />215 Doctor M.L.K. Jr. Boulevard, South Bend, Indiana 46601 <br />Proposal No.: 2022.00343 <br />Dear Jitin, <br />Thank you for contacting American Structurepoint, Inc., for your upcoming project. We look forward to <br />continuing our relationship and have prepared a thorough and comprehensive proposal for this project. <br />We appreciate your confidence and trust in our abilities, and thank you for affording us the opportunity <br />to submit the following proposal. <br />PROJECT SCOPE <br />We will provide architectural and engineering design services to prepare a property condition assessment <br />(PCA) along with evaluation of the existing building systems (i.e. mechanical-HVAC) and general review <br />of the existing spaces to facilitate space planning to accommodate the office needs of the City <br />departments. There are multiple satellite offices in addition to the City County Building that could be <br />relocated to this soon-to-be-acquired building (by the City from the Community School Board). <br />This proposal and the attached scope of professional services include cost estimating services, HVAC <br />systems analysis architecture, and interior design. It is our understanding this project will be phased, so <br />our first phase is to evaluate the existing building with maintenance needs against proposed renovations <br />to facilitate the space planning effort. Once budgeting and conceptual design/space planning are <br />approved, the next phase would be proposed with appropriate schedule. <br />SITE <br />The project is located at 215 Dr. Martin Luther King Jr. Boulevard and operates as the administration <br />building for the South Bend Community School Corporation. There are two existing elevated walkways <br />that connect this building to another building and both have access to an adjacent parking garage. For <br />the purposes of this proposal, we have omitted the assessment of the walkways and garage. We will <br />evaluate parking needs to be housed in the garage for City staff and public access. <br />DocuSign Envelope ID: AD573822-6EB6-43FA-9F1F-743C8A6D3FB4
The URL can be used to link to this page
Your browser does not support the video tag.