My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No 1 to OEA - Western Avenue Streetscape, Phase IV Proj No. 121-009 – HWC Engineering, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2022
>
Agreements/Contracts/Proposals/Addenda
>
Amendment No 1 to OEA - Western Avenue Streetscape, Phase IV Proj No. 121-009 – HWC Engineering, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2022 2:28:55 PM
Creation date
8/9/2022 2:28:52 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
8/9/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 1 <br />(Exhibit K – (Amendment to Owner-Engineer Agreement) – Attachment 1) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />This is EXHIBIT K, consisting of 3 pages, referred to in <br />and part of the Agreement between Owner and Engineer <br />for Professional Services dated September 15, 2021. <br />AMENDMENT TO OWNER-ENGINEER AGREEMENT <br />Amendment No. 1 <br />1.Background Data: <br />a.Effective Date of Owner-Engineer Agreement: September 15, 2021 <br />b.Owner:Board of Public Works, City of South Bend <br />c.Engineer: HWC Engineering, Inc. <br />d.Project: Western Avenue Streetscape – Phase 4 <br />2.Description of Modifications: <br />a. The Scope of Services currently authorized to be performed by Engineer in <br />accordance with the Agreement and previous amendments, if any, is modified as <br />follows: <br />EXHIBIT A <br />A1.02 Prelimianry Design Phase <br />A. <br />Add: <br />8.Utility private utility locator to assist with advancing the borings to <br />limit the risk of drilling into an underground utility as a result of <br />insufficient utility locates using conventional methods. <br />b. The schedule for rendering services is modified as follows: <br />EXHIBIT C <br />C2.01 Compensation for Basic Services- Lump Sum Method <br />A. <br />Change to: <br />1.A Lump Sum amount of $139,765.00 141,065.00 based on the <br />following estimated distrucbution of compensation: <br />b.Preliminary Design Phase $139,765.00 141,065.00 <br />5. Agreement Summary (Reference only) <br />a.Original Agreement amount:$ 139,765.00 <br />b. Net change for prior amendments:$ 0 <br />c. This amendment amount:$ 1,300.00 <br />d. Adjusted Agreement amount:$ 141,065.00
The URL can be used to link to this page
Your browser does not support the video tag.