Laserfiche WebLink
BID/PROPOSAL <br />CITY OF SOUTH BEND <br />Project Name: 2022 Community Crossing Road Rehabilitation Project <br />Project Number: 122-024R <br />For Bids Due: August 4, 2022 <br />Contractor Name: Rieth-Riley Construction Co., Inc. <br />DIVISION 2A - SOUTHLEA DRIVE BASE BID (FROM LILAC DR. TO EASTMONT DR.) <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />Common Excavation <br />1096 <br />CYS <br />$ 50.0 <br />$ 54,800.0 <br />2 <br />Concrete, Remove <br />4063 <br />SYS <br />$ 20.0 <br />$ 81,260.0 <br />3 <br />Subgrade Treatment Type II (Undistributed) <br />1317 <br />SYS <br />$ 25.0 <br />$ 32,925.0 <br />4 <br />Compacted No. 53 Subbase <br />1629 <br />TON <br />$ 38.0 <br />$ 61,902.0 <br />5 <br />Sidewalk, Concrete <br />354 <br />SYS <br />$ 170.00 <br />$ 60,180.0 <br />6 <br />Curb Ramp, Concrete <br />135 <br />SYS <br />$ 300.00 <br />$ 40,500.0 <br />7 <br />Milling, Concrete, 2" <br />22 <br />SYS <br />$ 160.00 <br />$ 3,520.0 <br />Mid ng, 4 in <br />SYS <br />$ <br />$ <br />9 <br />HMA Surface, 9.5 mm - Type B <br />335 <br />TON <br />$ 120.00 <br />$ 40,200.0 <br />10 <br />HMA Intermediate, 12.5 mm - Type B <br />559 <br />TON <br />$ 112.00 <br />$ 62,608.0 <br />11 <br />HMA Base, 25.0 mm - Type B <br />894 <br />TON <br />$ 95.0 <br />$ 84,930.0 <br />12 <br />Tack Coat <br />3 <br />TON <br />$ 1.0 <br />$ 3.0 <br />13 <br />Joint Adhesive, Surface <br />1366 <br />LFT <br />$ 1.2 <br />$ 1,639.2 <br />14 <br />PCCP for Approaches, 6 in. <br />531 <br />SYS <br />$ 200.0 <br />$ 106,200.0 <br />15 <br />Combined Curb & Gutter, Type A <br />2710 <br />LFT <br />$ 42.0 <br />$ 113,820.0 <br />16 <br />Sodding, Nursery <br />978 <br />SYS <br />$ 22.9 <br />$ 22,298.4 <br />17 <br />Adjust Manhole Casting to Grade <br />9 <br />EA <br />$ 300.00 <br />$ 2,700.0 <br />18 <br />Adjust Water Valve Casting to Grade <br />5 <br />EA <br />$ 200.00 <br />$ 1,000.0 <br />19 <br />Furnish and Adjust Casting to Grade <br />9 <br />EA <br />$ 1,300.00 <br />$ 11,700.0 <br />20 <br />Fire Hydrant Assembly <br />1 <br />EA <br />$14,650.00 <br />$ 14,650.0 <br />21 <br />Water Main Lowering, 6" DI <br />100 <br />LFT <br />$ 250.00 <br />$ 25,000.0 <br />22 <br />Mailbox Assembly, Remove & Reset <br />29 <br />EA <br />$ 350.00 <br />$ 10,150.0 <br />23 <br />Construction Engineering <br />1 <br />LS <br />$10,000.00 <br />$ 10,000.0 <br />24 <br />Mobilization and Demobilization <br />1 <br />LS <br />$60,000.00 <br />$ 60,000.0 <br />25 <br />Clearing Right of Way <br />1 <br />LS <br />$15,000.00 <br />$ 15,000.0 <br />26 <br />Maintenance of Traffic <br />1 <br />LS <br />$30,000.00 <br />$ 30,000.0 <br />27 <br />Erosion Control <br />1 <br />LS <br />$ 3,000.00 <br />$ 3,000.0 <br />28 <br />Water Main Line Stop <br />2 <br />EA <br />$12,600.00 <br />$ 25,200.0 <br />DIVISION 2A - SOUTHLEA DRIVE BASE BID TOTAL $975,185.60 <br />Version 09/29/2021 Contractor's Bid for Public Works - 8 <br />