Laserfiche WebLink
BID/PROPOSAL } <br />CITY OF SOUTH BEND <br />Project Name: 2022 Community Crossing Road Rehabilitation Project`s v <br />Project Number: 122-024R <br />For Bids Due: August 4, 2022 <br />Contractor Name: Rieth-Riley Construction Co., Inc. <br />DIVISION 2B - SOUTHLEA DRIVE ALTERNATE #1 (FROM LILAC DR. TO EASTMONT DR.) <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />Common Excavation <br />983 <br />CYS <br />NO BID <br />NO BID <br />2 <br />Concrete, Remove <br />4063 <br />SYS <br />NO BID <br />NO BID <br />3 <br />Subgrade Treatment Type II (Undistributed) <br />1317 <br />SYS <br />NO BID <br />NO BID <br />4 <br />Compacted No. 53 Subbase <br />1629 <br />TON <br />NO BID <br />NO BID <br />5 <br />Sidewalk, Concrete <br />354 <br />SYS <br />NO BID <br />NO BID <br />6 <br />Curb Ramp, Concrete <br />135 <br />SYS <br />NO BID <br />NO BID <br />7 <br />Milling, Concrete, 2" <br />22 <br />SYS <br />NO BID <br />NO BID <br />8 <br />Milling, 4 .- <br />22 <br />S-yS <br />NO BID <br />NO BID <br />9 <br />PCCP for Mainline, 7 in. <br />4063 <br />SYS <br />NO BID <br />NO BID <br />10 <br />D-1 Joints <br />3552 <br />LFT <br />NO BID <br />NO BID <br />11 <br />PCCP for Approaches, 6 in. <br />531 <br />SYS <br />NO BID <br />NO BID <br />12 <br />Combined Curb & Gutter, Type A <br />2710 <br />LFT <br />NO BID <br />NO BID <br />13 <br />Sodding, Nursery <br />978 <br />SYS <br />NO BID <br />NO BID <br />14 <br />Adjust Manhole Casting to Grade <br />9 <br />EA <br />NO BID <br />NO BID <br />15 <br />Adjust Water Valve Casting to Grade <br />5 <br />EA <br />NO BID <br />NO BID <br />16 <br />Fire Hydrant Assembly <br />1 <br />EA <br />NO BID <br />NO BID <br />17 <br />Water Main Lowering, 6" DI <br />100 <br />LFT <br />NO BID <br />NO BID <br />A <br />_ : _ �_ <br />rurnis'n and Adjust l.:asting to vra-de <br />J <br />EA <br />NO pTTI <br />'NM RTT; <br />19 <br />Mailbox Assembly, Remove & Reset <br />29 <br />EA <br />NO BID <br />NO BID <br />20 <br />Construction Engineering <br />1 <br />LS <br />NO BID <br />NO BID <br />21 <br />Mobilization and Demobilization <br />1 <br />LS <br />NO BID <br />NO BID <br />22 <br />Clearing Right of Way <br />1 <br />LS <br />NO BID <br />NO BID <br />23 <br />Maintenance of Traffic <br />1 <br />LS <br />NO BID <br />NO BID <br />24 <br />Erosion Control <br />1 <br />LS <br />NO BID <br />NO BID <br />25 <br />Water Main Line Stop <br />2 <br />EA <br />NO BID <br />NO BID <br />DIVISION 2B - SOUTHLEA DRIVE ALTERNATE #1 TOTAL NO BID <br />Version 09/29/2021 Contractor's Bid for Public Works - 16 <br />