My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - 2022 Community Crossings Road Rehabilitation Proj No. 122-024R - Rieth-Riley
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2022
>
Opening of Bids
>
Opening of Bids - 2022 Community Crossings Road Rehabilitation Proj No. 122-024R - Rieth-Riley
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2022 1:30:01 PM
Creation date
8/4/2022 1:25:01 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
8/4/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BID/PROPOSAL <br />CITY OF SOUTH BEND <br />Project Name: 2022 Community Crossing Road Rehabilitation Project <br />Project Number: 122-024R <br />For Bids Due: August 4, 2022 <br />Contractor Name: Rieth-Riley Construction Co., Inc. <br />DIVISION 4 - HILL STREET BASE BID (FROM JEFFERSON ST. TO COLFAX ST.) <br />30 <br />Grooving for Pavement Markings, 4 in. <br />2879 <br />LFT <br />$ 1.20 <br />$ 3,454.80 <br />31 <br />Transverse Marking, Thermoplastic, Stop Line, <br />24 in. <br />38 <br />LFT <br />$ 11.45 <br />$ 435.10 <br />32 <br />Transverse Marking, Thermoplastic, Crosswalk <br />Line, 6 in. <br />72 <br />LFT <br />3 <br />$ .65 <br />$ 262.80 <br />33 <br />Transverse Marking, Thermoplastic, Crosswalk <br />Line, 24 in. <br />56 <br />LFT <br />$ 13.75 <br />$ 770.00 <br />34 <br />Detector Housing, Remove <br />2 <br />EA <br />$ 320.00 <br />$ 640.00 <br />35 <br />Signal Detector Housing <br />2 <br />EA <br />$ 1,000.00 <br />$ 2,000.00 <br />36 <br />Signal Cable, Roadway Loop, Copper, 1 C/14 <br />GA <br />650 <br />LFT <br />$ 0.65 <br />$ 422.50 <br />37 <br />Saw Cutfor Roadway Loop Detector and <br />Sealant <br />205 <br />LFT <br />$ 15.00 <br />$ 3,075.00 <br />38 <br />Construction Engineering <br />1 <br />LS <br />$ 10,000.00 <br />$ 10,000.00 <br />39 <br />Mobilization and Demobilization <br />1 <br />LS <br />$82,000.00 <br />$ 82,000.00 <br />40 <br />Clearing Right of Way <br />1 <br />LS <br />$ 30,000.00 <br />$ 30,000.00 <br />41 <br />Maintenance of Traffic <br />1 <br />LS <br />$ 30,000.00 <br />$ 30,000.00 <br />42 <br />Erosion Control <br />1 <br />LS <br />$ 3,000.00 <br />$ 3,000.00 <br />43 <br />Tree, Remove, 4" <br />2 <br />EA <br />$ 300.00 <br />$ 600.00 <br />44 <br />Tree, Remove, 6" <br />2 <br />EA <br />$ 300.00 <br />$ 600.00 <br />45 <br />Tree, Remove, 8" <br />2 <br />EA <br />$ 400.00 <br />$ 800.00 <br />46 <br />Tree, Remove, 12" <br />2 <br />EA <br />$ 600.00 <br />$ 1,200.00 <br />47 <br />Tree, Remove, 15" <br />3 <br />EA <br />$ 800.00 <br />$ 2;400.00 <br />48 <br />1 Plant, Deciduous Tree, Single Stem, 2.0-2.5 In <br />22 <br />EA <br />1 $ 725.00 <br />$ 15,950.00 <br />DIVISION 4 - HILL STREET BASE BID TOTAL $800,242.75 <br />Version 09/29/2021 Contractor's Bid for Public Works - 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.