Laserfiche WebLink
<br />117 E Wayne St, South Bend, IN 46601 <br />(574) 208-3806 | www.theearlybirdeatery.com <br />eliminate up to four parking spots for clearance. This also would have <br />required additional approvals from a structural engineer in order to run <br />ductwork through the garage concrete and down the side of the <br />building back into the opening where the alley is located. We would also <br />have needed to redesign the make-up unit. The current unit required a 5 <br />month lead time and altering the make-up air would have required <br />additional time for production. <br />Our contractor discussed the location of the make-up unit in the alley with both <br />Mechanical inspectors from the City of South Bend building department. We were <br />under the impression that this was approved based on the original drawing <br />location of the make-up unit. Both Mike and Damien were there for the discussion <br />on the location of the exhaust and were informed where the make-up was going <br />to be installed. Our contractor was informed that as long as the Unit was not <br />protruding past the line of the current dumpsters that it would be fine. <br />Also, I would like to reiterate that there is a sidewalk and exit ramp further down <br />the alley, which boarder the only other exit to the alley, and which encroach on <br />the right of way, reducing it to a 9ft 4in pathway for entering and exiting vehicles. <br />I have included pictures of this as well, since these are permanent structures <br />which reduce the right of way much more than our make-up air and dumpsters <br />do. <br /> <br />I am happy to answer any other questions and can be reached via email at any <br />time. <br /> <br />Sincerely, <br /> <br /> <br /> <br />Jennifer Stone <br />