My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Contract - Signature for Construction of Coal Line Trail DES #2200199 in September 2022 - INDOT LPA - Signed
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2022
>
Agreements/Contracts/Proposals/Addenda
>
Contract - Signature for Construction of Coal Line Trail DES #2200199 in September 2022 - INDOT LPA - Signed
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2022 1:30:37 PM
Creation date
7/26/2022 1:30:25 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
7/26/2022
Text box
ID:
1
Creator:
Created:
7/26/2022 1:30 PM
Modified:
7/26/2022 1:30 PM
Text:
https://www.in.gov/indot/2833.htm
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 1 of 2 <br />ATTACHMENT A <br />PROJECT FUNDS <br /> <br />I. Project Costs. <br /> <br />A. This contract is just for the one (1) phase checked below: <br /> <br /> <br /> <br />Preliminary Engineering or <br /> <br /> <br />Right-of-Way or <br />X <br /> <br />Construction; <br /> <br />B. If the Program is receiving federal -aid funds for the project, the LPA is allocated the funds <br />through the MPO as written in their fiscally constrained TIP. Any adjustments (positive or <br />negative) to the dollar amount listed in the TIP, or any increase or d ecrease in the funding <br />from a prior year, authorized by the MPO that may not be reflected in the current TIP, are <br />hereby considered adjustments to the contract between the LPA and INDOT, as the MPO <br />must maintain fiscal constraint for all projects listed. Federal funds made available to the <br />LPA by INDOT will be used to pay 80% of the eligible Project costs. The maximum amount <br />of federal-aid funds allocated to the Project is dependent upon the current TIP allocation. As <br />of this date, May 19, 2022 , the maximum amount according to the TIP dated April 6, 2022 is <br />$2,920,000.00 . The most current MPO TIP page, or MPO authorization, is uploaded into <br />INDOT's Scheduling Project Management System (SPMS). <br /> <br />OR <br /> <br />C. Federal-aid Funds made available to the LPA by INDOT will be used to pay % of the <br />eligible Project costs. The maximum amount of federal funds allocated to the project is $ . <br /> <br />D. The LPA understands and agrees that it is INDOT's policy to only allow non -discretionary <br />changes to a Project scope after bidding. Changes to the Project scope after bidding that are <br />by the choice of the LPA and are not required to complete the Project wi ll not be eligible for <br />federal-aid funds and must be funded 100% locally. <br /> <br />E. The LPA understands and agrees that the federal-aid funds allocated to the Project are <br />intended to accomplish the original scope of the Project as designed. If the Project bid pri ces <br />are lower than estimated, the LPA may not utilize those federal-aid funds and the remaining <br />balance of federal-aid funds will revert back to the Local Program. <br /> <br />F. If the Program is Group I or Group II, Section E. does not apply. If the Project bid pric es are <br />lower than estimated, the LPA may not utilize those federal-aid funds and the remaining <br />balance of federal-aid funds will revert back to the MPO. <br /> <br />G. The remainder of the Project cost shall be borne by the LPA. For the avoidance of doubt, <br />INDOT shall not pay for any costs relating to the Project unless the PARTIES have agreed in <br />a document (which specifically references section I.D. of Attachment A of this Contract) <br />signed by an authorized representative of INDOT, the Indiana Department of Administrat ion, <br />State Budget Agency, and the Attorney General of Indiana. <br /> <br />H. Every project must have a project end date based upon the reasonable timeframe for the <br />project phase to be completed. If a project end date lapses, the project is no longer eligible for <br />federal reimbursement in accordance with 2 CFR 200. See https://www.in.gov/indot/2833.htm. <br /> <br />DocuSign Envelope ID: B1357855-6DB1-4F84-9C68-8BC5666693E3
The URL can be used to link to this page
Your browser does not support the video tag.