My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Title Sheet - Coal Line Trail, Phase IIB Proj No. 122-035
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2022
>
Title Sheets
>
Title Sheet - Coal Line Trail, Phase IIB Proj No. 122-035
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2022 1:26:00 PM
Creation date
7/26/2022 1:25:55 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
7/26/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
P.O.T.14+03.40 "PR-CLT 2"End Project 1401811WILBER ST.DIAMOND AVE.W. ANGELA BLVD.LINCOLN WAY W.PORTAGE AVE.N. MICHIGAN ST.363534123RIVERSIDE DR.P.O.T.10+00.00 "PR-CLT 2"Begin Project 1401811Coal Line Trail overSt. Joseph RiverProject LocationSHEETSofCONTRACTBRIDGE FILEPROJECTDESIGNATIONSURVEY BOOK-2200199-B-442921392200199File Name: P:\RD\C3D\16-406\Bridge\Dwg\Plans\Title Sheet.dwg Plot Date: 4/22/2022 Plotted By: Chris DyerScale 1" = 1,000'PROJECTDESIGNATIONCONTRACTINDIANA DEPARTMENT OF TRANSPORTATIONDATEDATEPHONE NUMBERFOR LETTING:APPROVEDCERTIFIED BY:PREPARED BY:PLANSBRIDGE FILEINDIANA DEPARTMENT OF TRANSPORTATIONSTANDARD SPECIFICATIONS DATED 2022TO BE USED WITH THESE PLANSINDIANA DEPARTMENTOF TRANSPORTATIONBRIDGE REHABILITATION PLANS-2200199B-442922200199HUC 14:Bridge Length:Trail Length (Phase IIB):Net Length:Maximum Grade:040500012400400.064 MI.0.012 MI.0.076 MI.2.00 %PROJECT LOCATION MAPCITY OF SOUTH BENDBRIDGE REHABILITATION OF ABANDONED NORFOLK SOUTHERN RAILROAD BRIDGEOVER ST. JOSEPH RIVER, LOCATED IN SECTION 35, TOWNSHIP 38 NORTH, ANDSECTION 2, TOWNSHIP 37 NORTH, RANGE 2 EAST, PORTAGE TOWNSHIP, CITY OFSOUTH BEND, ST. JOSEPH COUNTY, INDIANA.T 38 NT 37 NT 38 NT 37 N86°15'47" WLATITUDE:41°41'38" NLONGITUDE:PROJECT LOCATION SHOWN BYKIN DESIGNATION NUMBERSROADWAY2200199Coal Line Trail Phase IIB (Part 1 of 2)BRIDGEBridge Over St. Joseph River (Part 2 of 2)(PHASE IIB) P.E.FOR SPANS OVER 20 FEETPROJECT NO. 2200199COAL LINE TRAIL OVER ST. JOSEPH RIVERSTATIONSPAN AND SKEWOVERINDEXTYPESTRUCTURECOMBINATION:ROLLED STEEL &RIVETED PLATEGIRDERSCOAL LINE TRAIL7 SPANS:28'-8", 59'-11 5/8", 60'-4 3/4",43'-7 3/4", 49'-1 1/4", 49'-1", 39'-4 3/4"SKEW: 0°12+34.75"PR-CLT 2"2200199ST. JOSEPHRIVER8440 Allison Pointe Boulevard, Suite 200Indianapolis, IN 46250Phone 317-895-2585www.ucindy.comR 2 EFINNAN P. CAVANAUGH, E.I.TOY VILLAGARY A. GILOTJORDAN V. GATHERSJOSEPH R. MOLNARTHERESA M. HEFFNERMURRAY L. MILLERCITY OF SOUTH BENDAPPROVED BY BOARD OF PUBLIC WORKSDATECITY ENGINEERCONSTRUCTIONAPPROVED BY CITY STAFFPRESIDENTMEMBERMEMBERMEMBERCLERKMEMBERKARA M. BOYLES, Ph.D., P.E.ADMINISTRATION & DESIGN (ERC)ELIZABETH A. MARADIKB-44292PART 2 OF 2C:\Users\nora.rasche\Desktop\signatures.JPG..\Users\nora.rasche\Desktop\city staff.JPG..\Users\nora.rasche\Desktop\micheal R.JPG7/19/202207/19/20227/21/2022July 26, 2022
The URL can be used to link to this page
Your browser does not support the video tag.