My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rejection of Bid - South Well Field Backwash Line Relocation Proj No. 117-059C - HRP Construction, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2022
>
Reject Bids/Quotes/Proposals
>
Rejection of Bid - South Well Field Backwash Line Relocation Proj No. 117-059C - HRP Construction, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2022 1:23:57 PM
Creation date
7/26/2022 1:23:55 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
7/26/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
INTER-OFFICE MEMORANDUM <br /> DEPARTMENT OF PUBLIC WORKS <br /> DIVISION OF ENVIRONMENTAL SERVICES <br />TO: Members of the Board of Public Works <br />Clara McDaniels, Assistant City Attorney Public Works <br />Laura Hensley, Clerk <br />FROM: Jacob M. Klosinski, P.E., Assistant City Engineer <br />SUBJECT: 117-059C South Well Field Backwash Line Relocation <br />Agenda Request – Reject Bids & New Request to Advertise <br />DATE: July 18, 2022 <br />The Board of Public Works opened and read bids at the July 12, 2022 Board of Public Works <br />meeting for the subject project. One bid was received and the bids ranked as follows: <br />CONTRACTOR TOTAL BASE BID <br />HRP Construction, Inc.$312,508.00 <br />Assessment <br />In general, the Bid documents submitted by HRP Construction were found to be complete. All <br />critical items were submitted. However, the Bid for the project exceeded the Engineer’s Estimate <br />for the subject work by more than 70%. In addition, it was determined that some of the bid items <br />appeared to be unbalanced given the scope of work for the bid items. <br />Recommendation – Reject Bid and Rebid with Adjusted Completion Schedule <br />As a result of bid exceeding the Engineer’s Estimate and the lack of competitive bids for the subject <br />project, the Division of Engineering and Division of Utilities recommends the Board of Public Works <br />rejecting the lone bid for the subject project. The Divisions would like to rebid the project with the <br />following Bid Schedule: <br />Advertisement 1: July 29, 2022 <br />Advertisement 2: August 5, 2022 <br />Pre-Bid Meeting: August 10, 2022 <br />Bid Opening: August 23, 2022 <br />Bid Award (tentative): September 13, 2022 <br />Attached, herein, is an updated Notice to Bidders for publication. The Bid Specifications Front <br />End Document will be adjusted to reflect new bid dates and updated construction schedule. <br />For questions regarding the subject agenda request, contact Jacob M. Klosinski (Ext. 9496) at <br />the Division of Engineering. <br />July 26, 2022
The URL can be used to link to this page
Your browser does not support the video tag.