Laserfiche WebLink
<br />Version 9/29/2021 Page - 7 Public Works Quote <br />Main/Colfax Parking <br />Garage <br />2 2 Wall ZEFNET-40- <br />CWS <br />Leighton Parking Garage 2 2 Wall ZEFNET-40- <br />CWS <br /> <br />Drawings entailing where at each location the charging station would be installed are included in Attachment 1 to this notice. <br /> <br /> <br />XXI. ELECTRICAL VEHICLE SUPPLY EQUIPMENT (EVSE) <br />A. Prevailing Specifications: None <br />B. Additions <br />i. The scope of work includes all aspects related to the installation of EVSE at nine (9) locations <br />within the City of South Bend. This includes, but may not be limited to the following: <br /> <br />1. Construction, Maintenance, and other activities a. Project Management for EV Charging Station Installations <br />b. Securing the proper permits from St. Joseph County / City of South Bend Building <br />Department. The work requires that the contractor or electrician accomplish the <br />installation of the EV charging stations. <br />c. Work with Indiana Michigan Power as needed to ensure proper service connection <br />to the charging station <br />d. Coordinate with Indiana Michigan Power to select the appropriate tariff for new <br />meters, if any <br />e. If applicable, complete application for Indiana Michigan Power’s IM Plugged In <br />Program to secure available incentives <br />f. Site preparation (utility infrastructure, boring/trenching, asphalt or concrete <br />removal/repair, etc.) <br />g. Furnish all labor and materials necessary to install and bring into service the EVSE <br />h. The EVSE unit to be installed at the Potawatomi Zoo shall be a ZEFNET-40- Pro or <br />approved equal. <br />i. The ZEFNETPro EVSE unit shall not have a credit card module. <br />j. Acceptable manufacturers of the EVSE Unit include: <br />Chris Grunseth - Director of Commercial Sales <br />Email: chris.grunseth@zefenergy.com <br />Office: (+1) (612) 213-1504 <br />Cell: (+1) (952) 393-8664 <br />k. The eight (8) units to be installed at the Century Center and Parking Garages will <br />be provided by the City. <br />l. Completing installation and related safety protocols of EVSE <br />m. The Contractor should avoid installing more than one unit on a single 40-amp <br />breaker in power sharing configuration, unless required by Indiana Michigan Power <br />and written consent from the City. <br />n. Commissioning/Testing of new EVSE to ensure proper installation and operational <br />settings <br />o. Coordinate access with the City of South Bend or appropriate entity (i.e. <br />Potawatomi Zoo). Signage and striping to be done by the City and will need to be <br />coordinated in advance of installation. <br />p. Installation shall be in accordance with the User Manual instructions included in <br />this quote <br /> <br /> <br />ii. Electric Vehicle Supply Equipment be paid for by each and include all necessary equipment, <br />hardware, and appurtenances at each location. Payment will include all materials and <br />workmanship. <br /> <br />