Laserfiche WebLink
<br />Version 9/29/2021 Page - 6 Public Works Quote <br />c. Between William/Madison and William Marion- New service point needed <br />d. Indiana and Main- Replace controller cabinet <br /> <br />3. Prior to commencement of work at each location, the Contractor shall provide a cost estimate of <br />time and materials for review by the City representatives. <br />4. The Contractor shall preserve and protect all surrounding property, structures, tenants, visitors and <br />their property from damage caused by the Contractor’s operations. <br /> <br />XIX. TS-2 CONTROLLER P-1 FOUNDATION <br /> <br />A. Prevailing Specifications: 2022, INDOT Standard Specification Section 805 <br />B. Additions <br />1. A Type P-1 foundation shall be provided for a TS-2 Controller Cabinet in accordance with INDOT <br />Standard Drawings, see attached sheet. <br />2. The Contractor shall call for utility locates prior to the installation of the foundation. <br />3. Placement of the foundation shall be field verified by the Engineer prior to installation. <br />4. Cabinet foundation, wiring, and all connections necessary are included in this pay item. <br />5. The item TS-2 CONTROLLER P1 FOUNDATION shall be measured by each properly installed. <br />6. Payment shall be made at the contract unit price as set forth in the proposal as follows: <br /> <br />TS-2 CONTROLLER P-1 FOUNDATION……………… EA <br /> <br />XX. TS-2 CONTROLLER CABINET, INSTALL <br /> <br />A. Prevailing Specifications: 2022, INDOT Standard Specification Section 805 <br />B. Additions <br />1. This work shall consist of installing the TS-2 Controller Cabinet to the poured foundation. <br />2. Contractor shall contact Coby Deal of City of South Bend Traffic and Lighting at 574-245-6001 to <br />coordinate pick up of the materials. The City will not be responsible for delivery of materials to the <br />project site. <br />3. The item INSTALL TS-2 CONTROLLER CABINET shall be measured by each properly installed. <br />4. Payment shall be made at the contract unit price as set forth in the proposal as follows: <br /> <br />TS-2 CONTROLLER CABINET, INSTALL ……………… EA <br /> <br />XXI. TESCO CABINET, INSTALL <br />A. Prevailing Specifications: 2022, INDOT Standard Specification Section 805 <br />B. Additions <br />1. The electric service pedestals shall be a City of South Bend approved enclosure as manufactured <br />by Tesco Controls, Inc. Location of single and dual meter service pedestals are provided in the <br />plans. TESCO cabinets shall be painted black. <br />2. Cabinet foundation, wiring and all connections necessary are included in this pay item. <br />3. Traffic signals shall remain in operation at all times during installation of service pedestals. <br />4. The Contractor shall extend the wiring from the existing signal cabinet to the new service pedestal <br />in new conduit. <br />5. The removal of the existing service from the existing controller cabinet as shown on the plans will <br />not be paid for separately but shall be included in the cost of this pay item. <br />6. Payment shall be made at the contract unit price as set forth in the proposal as follows: <br /> <br />TESCO CABINET W/ DUAL SERVICE, FOUNDATION, WIRING, ETC, INSTALL……………… EA <br />TESCO CABINET W/ SINGLE SERVICE, FOUNDATION, WIRING, ETC, INSTALL……………… EA <br /> <br /> <br />XXII. SIGNAL CANTILIEVER, FOUNDATION <br /> <br />A. Prevailing Specifications: 2022, INDOT Standard Specification Section 805 <br />B. Additions <br />1. Signal Cantilever Foundation shall be installed in accordance with 2010 INDOT Standard <br />Drawing E805-SGMA, see attached sheet.