Laserfiche WebLink
<br />Version 9/29/2021 Page - 8 Public Works Quote <br />contact Coby Deal of City of South Bend Traffic and Lighting at 574-245-6001 to coordinate pick <br />up of the materials. The City will not be responsible for delivery of materials to the project site. <br />2. Pedestrian push button assemblies shall be in accordance with MUTCD and ADA guidelines. <br />3. The item PEDESTRIAN PUSH BUTTON ASSEMBLY, APS, INSTALL shall be measured by <br />each properly installed. <br />4. Payment shall be made at the contract unit price as set forth in the proposal as follows: <br /> <br />PEDESTRIAN PUSH BUTTON ASSEMBLY, APS, INSTALL ……………… EA <br /> <br />XXVII. PEDESTRIAN SIGNAL HEAD, INSTALL <br /> <br />A. Prevailing Specifications: 2022, INDOT Standard Specification Section 805 <br />B. Additions <br />1. Work for this item shall include the installation and assembly of new pedestrian signal heads. <br />Materials will be provided by City of South Bend Traffic and Lighting. Contractor shall contact Coby <br />Deal of City of South Bend Traffic and Lighting at 574-245-6001 to coordinate pick up of the <br />materials. The City will not be responsible for delivery of materials to the project site. <br />2. Pedestrian push button assemblies shall be in accordance with MUTCD and ADA guidelines. <br />3. The item PEDESTRIAN SIGNAL HEAD, INSTALL shall be measured by each properly installed. <br />4. Payment shall be made at the contract unit price as set forth in the proposal as follows: <br /> <br />PEDESTRIAN SIGNAL HEAD, INSTALL ……………… EA <br /> <br />XXVIII. CONDUIT <br /> <br />A. Prevailing Specifications: 2022, INDOT Standard Specification Section 805 <br />B. Additions <br />1. The material provided shall meet the National Electrical Manufacturers Association (NEMA) TC-2, <br />Type 2 requirements. <br />2. All conduit shall be paid for at the contract unit price per linear foot (LFT) installed. The cost of all <br />labor, material, utility and equipment necessary to complete the work shall be included in the unit <br />price. Any required drilling or coring of existing handholes shall be included in the conduit unit price. <br />3. Payment shall be made at the contract unit price as set forth in the proposal as follows: <br /> <br />CONDUIT, PVC SCHEDULE 80, 3” ……………… LFT <br />CONDUIT, PVC SCHEDULE 80, 2” ……………… LFT <br /> <br />XXIX. SIGNAL CABLE <br /> <br />A. Prevailing Specifications: 2022, INDOT Standard Specification Section 805 <br />B. Additions <br />1. All signal cable shall be paid for at the contract unit price per linear foot (LFT) installed. The cost <br />of all labor, material, utility, and equipment necessary to complete the work shall be included in <br />the respective contract unit prices for signal cable. <br />2. Payment shall be made at the contract unit price as set forth in the proposal as follows: <br /> <br />SIGNAL CABLE, 3C/8 GA ……………… LFT <br />SIGNAL CABLE, 5C/14 GA ……………… LFT <br />SIGNAL CABLE, 3C/14 GA ……………… LFT <br />SIGNAL CABLE, 7C/14 GA ……………… LFT <br /> <br />XXX. STREET IDENTIFICATION SIGN, INSTALL <br /> <br />A. Prevailing Specifications: 2022, INDOT Standard Specification Section 805 <br />B. Additions <br />1. Work for this item shall include the installation and assembly of new street identification signs. <br />Materials will be provided by City of South Bend Traffic and Lighting. Contractor shall contact Coby <br />Deal of City of South Bend Traffic and Lighting at 574-245-6001 to coordinate pick up of the <br />materials. The City will not be responsible for delivery of materials to the project site.