My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Award Bid - 2022 Curb and Sidewalk, Round I Proj No. 122-001
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2022
>
Award Bids
>
Award Bid - 2022 Curb and Sidewalk, Round I Proj No. 122-001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2022 1:20:30 PM
Creation date
7/26/2022 1:19:48 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
7/26/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Upon review by the Director of Purchasing, the bid by Rieth-Riley Construction was determined to <br />be non-responsive for all divisions, since the proposed MBE utilization was below the set goals in all <br />divisions, and the bidder did not complete Good Faith Effort, having not attended the pre-bid <br />meeting. <br />The bid by Premium Concrete included proposals for divisions 3, 4, and 5, and submitted no bid for <br />divisions 1 and 2. For the bidded divisions 3, 4, and 5, Premium’s proposed WBE utilization was <br />below the set goals. However, upon review by the Director of Purchasing, the bidder did complete <br />the Good Faith Effort requirements and was thus determined to be responsive. <br />The bids by Milestone Contractors North and Selge Construction were found to be responsive, <br />inclusive of all required documentation. <br />The Division of Engineering recommends award of Divisions 1 and 2 to Milestone <br />Contractors North, in the total amount of $633,484.00. <br />Engineering recommends separate award of Divisions 3, 4, and 5 to Premium Concrete, in <br />the total amount of $393,685.00. <br />The total recommended award amount between both contracts is $1,027,169.00. Engineering <br />recommends rejecting all other bids for each division. <br />The Department of Public Works has appropriated sufficient funds from Fund 202 Curb and <br />Sidewalk Division, and Fund 101 Other Contractual Services (PR #00016964). <br />Please respond with any questions. <br />Enclosure <br />Bid Tabulation
The URL can be used to link to this page
Your browser does not support the video tag.