Laserfiche WebLink
Version 09/29/2021 Contractor’s Bid for Public Works - 2 <br />CITY OF SOUTH BEND, INDIANA <br />CONTRACTOR’S BID FOR PUBLIC WORK <br />Project Name Morris Box Office Renovation <br />Project No. 121-029C <br />For Bids Due July 26, 2022 <br />PART I <br />(Must be completed for all bids. Please type or print) <br />Date: Bidder (Firm): <br />Address: <br />City/State/Zip: Telephone Number: ( ) <br />Agent of Bidder (if Applicable): <br />Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the <br />public works project of: <br />the City of South Bend, Indiana, in accordance with plans and specifications prepared by: <br />and dated for the sum of (enter the Total Bid as shown on the Proposal) <br />($ ) <br />(Enter sum of Total Base Bid plus Alternates shown on Proposal) (Numerical) <br />The undersigned further agrees to furnish a bond or certified check with this bid for an amount specified in <br />the notice of the letting. If alternative bids apply, the undersigned submits a proposal for each in accordance <br />with the notice. Any addendums attached will be specifically referenced at the applicable page. <br />If additional units of material included in the contract are needed, the cost of units must be the same as that <br />shown in the original contract if accepted by the City of South Bend. If the bid is to be awarded on a unit <br />basis, the itemization of the units shall be shown on a separate attachment. <br />ACCEPTANCE <br />The above bid is accepted this day of 20 <br />Subject to the following conditions: <br />BOARD OF PUBLIC WORKS <br />Elizabeth A. Maradik, President Joseph R. Molnar, Vice President <br />Gary A. Gilot, Member Jordan V. Gathers, Member <br />Murray L. Miller, Member Attest: Theresa Heffner, Clerk <br />By <br />(Signature) <br />(Printed Name of Person Signing) <br />7/26/22 Larson-Danielson Construction Company, Inc. <br />302 Tyler Street <br />LaPorte, IN 46350 219 362-2127 <br />Morris Box Office Renovation <br />6/24/22 <br />City of South Bend <br />X <br />Brian T. Larson, PresidentLARSON-DANIELSON <br />CONSTRUCTION CO., INC. <br />S T A TE OF <br />INDIA AN <br />SEAL <br />C or porate <br />283,563.00Two Hundred Eight Three Thousand, Five Hundred Sixty Three & 00/100