Laserfiche WebLink
MIDLAND ENGINEERING CO., INCPH: 574-272-0200FAX: 574-272-740052369 STATE ROUTE 933 N.SOUTH BEND, IN 46637A-1SHEET 1 OF 7SYMBOL KEYROOF PLANISSUE:DATE:DRAWN BY:APPROVAL4/19/2022 MJAREVISION 16/29/2022CAHMORRIS PERFORMING ARTSCENTER & PALAIS ROYALERE-ROOF211 N. MICHIGANSOUTH BEND, IN 46601&105 W. COLFAX AVESOUTH BEND, IN 46601GENERAL NOTES1)ROOF SYSTEM NEEDS TO MEET 20 YEAR WARRANTYREQUIREMENTS2)REVIEW CONSTRUCTION DRIVEN MOISTURE SUBMITTAL3)MEMBRANE PROTECTION- CLEAN ANY DEBRIS OFF THE INSTALLED MEMBRANE- INSTALL A MINIMUM 11 OZ. FELT, CARPET, OR INSULATION- INSTALL A MINIMUM 1/2" PLYWOOD OVER THE FELT, CARPET, ORINSULATION- FOR ANY SOLDERING OR WELDING USE PROPER APRONS OVERTHE PLYWOOD- PROTECT ALL DETAILS - CURBS, VENTS, PIPES, ETC.- ANY DAMAGE MUST BE MARKED ON THE ROOF AND BROUGHT TOTHE ROOFING APPLICATORS ATTENTION SO IMMEDIATE REPAIRSCAN BE COMPLETED- DAMAGE OR ABUSE IS NOR COVERED WITHIN THE SCOPE OF THEWARRANTY4)ANY GYPSUM SHEATHING THAT WILL BE REQUIRED TO BE COVEREDWITH MEMBRANE ROOFING MUST BE DENS DECK PRIME(EXAMPLES: BACK SIDE OF PARAPET WALLS, EXTERIOR SHEATHINGON STUDS WALLS, ETC.)5)PVC SYSTEMS ONLY: ASPHALT BASED WEATHER/AIR BARRIERSCANNOT BE IN CONTACT WITH ROOFING MEMBRANE. ASEPARATION BETWEEN THE TWO MUST BE INSTALLED6)ALL VERTICAL TERM BAR MUST BE CAULKED ON BOTH SIDES. ALLFASTENER HEADS MUST BE CAULKED7)T-JOINT & BLOW-OUT PATCH REQUIREMENTSSARNAFIL - T-JOINTS REQUIRED ON ALL JOBS WITH .072 AND GREATERMEMBRANE - BLOW-OUT PATCHES NOT REQUIRED1A-41A-43A-4LOWHIGH3A-4LOW3A-4LOW1A-43A-4LOWHIGH3A-4LOW1A-43A-4LOWHIGH4A-41A-41A-41A-41A-41A-41A-41A-41A-41A-4HIGHHIGHHIGHHIGH8A-48A-42A-4HIGH1A-41A-41A-42A-41A-42A-42A-42A-41A-41A-41A-41A-41A-45A-41A-55A-46A-46A-45A-45A-45A-45A-5TYP5A-5TYP2A-5TYP3A-54A-5TYP6A-56A-53A-4LOW3A-4LOW3A-4LOW3A-4LOW3A-4LOW3A-4LOW3A-4LOW5A-45A-41A-4HIGH3A-4LOW7A-57A-46A-5ROOF PLANSCALE: 1/8" = 1'-0"