My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1. 720 Park Avenue_COA 2022-0621
sbend
>
Public
>
Historic Preservation
>
2022
>
July
>
1. 720 Park Avenue_COA 2022-0621
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2022 4:47:31 PM
Creation date
7/14/2022 4:36:48 PM
Metadata
Fields
Template:
South Bend HPC
HPC Street Address
720 Park Avenue
HPC Document Type
Certification
HPC Local Historic District
ix. Chapin Park
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1 <br />Adam Toering <br />From:John Christopher Sikorski < <br />Sent:Tuesday, July 12, 2022 12:13 PM <br />To:Adam Toering <br />Subject:Re: Window repair at 720 Park Avenue <br />Attachments:E75APAU0712221209.pdf <br />Hi Adam, <br />Thanks, yes it looks like if I want a variance, we'll have to table the barn discussion. At the same time, <br />since I already applied, would it be possible for the HPC to consider it and give a "conditional " <br />approval pending zoning approval at the next zoning meeting? Or, could we consider the COA <br />application without the variance, which would potentially give me approval for the project, and then I <br />would still be able to proceed with the zoning variance request, which would put the responsibility on <br />me (ie: if I went and built the slab and poured it too close to the setback, then the city would obviously <br />make me tear it up, so it would be incumbent on me to get the variance request). These thoughts are <br />all in the interest of not having to go through the COA application process once again and <br />streamlining the process for all involved. <br /> <br />I now (finally) also have a sample quote for window replacement for Marvin Ultimates. The quote is a <br />sample insofar as I had only three windows (each of a different size--one living, one hallway, <br />bedroom) priced as an example of a very accurate ballpark. The first window on the quote is actually <br />the largest window in our house, so you can see that any other windows would actually be lower in <br />cost than this one. They are at least half (if not less than half) of the HG Christman quote. <br /> <br />Unfortunately, Shoberg window restoration out of Plymouth has shut down due to a family <br />circumstance (their son passed away of cancer in September), which further limits contractors who <br />can do this work. I did have a good conversation with our neighbor and former HPDC member Tim <br />Kluszcinski (who I think did some of your windows), and we are considering his services. I do not <br />have a written quote from him, but we are inclined to work with him on at least some of the <br />windows. At the same time, this does not mean that we would not desire to continue with the request <br />for replacement of at least some of the others, given the lead time (over a year for HG Christman) and <br />the much lower cost and shorter lead time of placing the high-quality Marvins that we already have in <br />the kitchen/dining area of the home. <br /> <br />Let me know if you need anything else at this point that might be helpful to the application. <br />Thank you! <br />John <br /> <br /> <br /> <br />_____________ <br />John Sikorski, PhD <br />Postdoctoral Teaching Scholar <br /> <br />To help protect yMicrosoft Office pautomatic downlopicture from the Mendoza C ollege <br /> <br /> <br /> <br />On Tue, Jul 12, 2022 at 11:30 AM Adam Toering <atoering@southbendin.gov> wrote:
The URL can be used to link to this page
Your browser does not support the video tag.