My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order Nos 4-7 & 9-15 - Coal Line Trail Proj No. 115-063 - INDOT & Selge Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2022
>
Change Orders
>
Change Order Nos 4-7 & 9-15 - Coal Line Trail Proj No. 115-063 - INDOT & Selge Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2022 2:50:03 PM
Creation date
7/12/2022 2:49:31 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
7/12/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Contract No:R -38064 INDIANA Date:06/27/2022 <br />Change Order No:012 Department of Transportation Page: 3 <br />Contract:R -38064 <br />Project:1401810 - State:140181000LC4 <br />Change Order Nbr: 012 <br />Change Order Description: 6 Foot Chain Link Fence <br />Reason Code:ERRORS & OMISSIONS, Design/Plan Related <br />CLN PCN PLN Item Code Unit Unit Price CO Qty Comment Amount Change <br />0140 1401810 0139 603-92636 LFT 47.260 300.000 C Amount:$ 14,178.00 <br />Item Description:FENCE CHAIN LINK 72 IN <br />Supplemental Description1: <br />Supplemental Description2: <br />Total Value for Change Order 012 = $ 14,178.00 <br />Whereas, the Standard Specifications for this contract provides for such work to be performed, the following change is recommended. <br />General or Standard Change Order Explanation <br />The contract called to remove the existing chain link fence between the new trail construction and the parking lot at Portage Plaza. It did call to <br />replace this fence. After the trail was constructed, it was determined that the fence should be replaced to keep pedestrians and vehicles from <br />accessing the trail from the parking lot. It will also deter a vehicle from crossing the trail and heading down a steep embankment providing a level <br />of safety. The contractors request for change order is attached to this change order. A cost analysis was performed, and the unit price was found <br />to be inside the average unit price for this item and deemed acceptable. The work is necessary to complete the original scope of the contract and <br />also provides additional safety measures and is there for deemed participating. The AE and PM have been notified and their notification, <br />concurrence emails are attached. <br />Change Order Explanation for Specific Line Item <br />**************************************************************************************************************************** <br />It is the intent of the parties that this change order is full and complete compensation for the work describe above. <br />Notification and consent to this change order is hereby acknowledged. <br />Contractor:____________________________________________Signed By:_____________________________________________ <br />Date:__________________________________________________ <br />*************************************************************************************************************************** <br />NOTE: Other required State and FHWA signatures will be obtained electronically through the SiteManager system. <br />Selge Construction Co., Inc. <br />Robert P. Kuhns, P.E. <br />6/28/22
The URL can be used to link to this page
Your browser does not support the video tag.