Change Order Nos 4-7 & 9-15 - Coal Line Trail Proj No. 115-063 - INDOT & Selge Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2022
>
Change Orders
>
Change Order Nos 4-7 & 9-15 - Coal Line Trail Proj No. 115-063 - INDOT & Selge Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2022 2:50:03 PM
Creation date
7/12/2022 2:49:31 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
7/12/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Contract No:R -38064 INDIANA Date:06/27/2022 <br />Change Order No:010 Department of Transportation Page: 3 <br />Contract:R -38064 <br />Project:1401810 - State:140181000LC4 <br />Change Order Nbr: 010 <br />Change Order Description: Additional Construction Engineering <br />Reason Code:SCOPE CHANGES, Added Quantities/Items <br />CLN PCN PLN Item Code Unit Unit Price CO Qty Comment Amount Change <br />0138 1401810 0137 105-06845 LS 6,577.830 1.000 C Amount:$ 6,577.83 <br />Item Description:CONSTRUCTION ENGINEERING <br />Supplemental Description1: Additionall <br />Supplemental Description2: <br />Total Value for Change Order 010 = $ 6,577.83 <br />Whereas, the Standard Specifications for this contract provides for such work to be performed, the following change is recommended. <br />General or Standard Change Order Explanation <br />The subcontractor completed construction engineering of the original trail alignment prior to the decision to realign the trail as explained in <br />change order 5. This change order is for the cost to complete construction engineering of the new trail alignment between approximately Station <br />15.00 to 38.00. The contractors request for change order is attached to this change order. A cost analysis was not performed; however, the cost <br />compares with the original contract price and the percentage of work completed and deemed acceptable. The work is not necessary to complete <br />the original scope of the contract and therefore deemed non participating. The AE and PM have been notified and their notification, concurrence <br />emails are attached. <br />Change Order Explanation for Specific Line Item <br />**************************************************************************************************************************** <br />It is the intent of the parties that this change order is full and complete compensation for the work describe above. <br />Notification and consent to this change order is hereby acknowledged. <br />Contractor:____________________________________________Signed By:_____________________________________________ <br />Date:__________________________________________________ <br />*************************************************************************************************************************** <br />NOTE: Other required State and FHWA signatures will be obtained electronically through the SiteManager system. <br />Selge Construction Co., Inc. <br />6/28/22 <br />Robert P. Kuhns, P.E.