My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order Nos 4-7 & 9-15 - Coal Line Trail Proj No. 115-063 - INDOT & Selge Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2022
>
Change Orders
>
Change Order Nos 4-7 & 9-15 - Coal Line Trail Proj No. 115-063 - INDOT & Selge Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2022 2:50:03 PM
Creation date
7/12/2022 2:49:31 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
7/12/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Contract No:R -38064 INDIANA Date:06/27/2022 <br />Change Order No:007 Department of Transportation Page: 3 <br />Contract:R -38064 <br />Project:1401810 - State:140181000LC4 <br />Change Order Nbr: 007 <br />Change Order Description: KC Tree Additional Mobilization and Tree Removal <br />Reason Code:SCOPE CHANGES, Work Outside Const Limits <br />CLN PCN PLN Item Code Unit Unit Price CO Qty Comment Amount Change <br />0136 1401810 0135 201-52370 LS 4,066.000 1.000 C Amount:$ 4,066.00 <br />Item Description:CLEARING RIGHT OF WAY <br />Supplemental Description1: Additional <br />Supplemental Description2: <br />Total Value for Change Order 007 = $ 4,066.00 <br />Whereas, the Standard Specifications for this contract provides for such work to be performed, the following change is recommended. <br />General or Standard Change Order Explanation <br />The subcontractor began clearing right of way for the original trail alignment. Shortly after beginning clearing, they were instructed to stop as the <br />alignment of the trail was going to move after the City of South Bend realized they owned all the right of way and could move the trail to the old <br />railroad roadbed, which was much more desirable. After 4 months of redesign and environmental review work resumed on clearing the right of <br />way. This change order is for the costs for the subcontractor to remobilize to the site and for two trees that were removed outside of the <br />construction limits at the request of the city. The contractors request for change order is attached to this change order. A cost analysis was not <br />performed; however, the costs agree with the original cost of clearing right of way for the contract and deemed acceptable. This work is not <br />necessary to complete the original scope of the contract and therefore deemed non participating. The AE and PM have been notified and their <br />notification, concurrence emails are attached. <br />Change Order Explanation for Specific Line Item <br />**************************************************************************************************************************** <br />It is the intent of the parties that this change order is full and complete compensation for the work describe above. <br />Notification and consent to this change order is hereby acknowledged. <br />Contractor:____________________________________________Signed By:_____________________________________________ <br />Date:__________________________________________________ <br />*************************************************************************************************************************** <br />NOTE: Other required State and FHWA signatures will be obtained electronically through the SiteManager system. <br />Selge Construction Co., Inc. <br />6/28/22 <br />Robert P. Kuhns, P.E.