Laserfiche WebLink
2. The streets segments for the base and both alternates are summarized below: <br />Illinois Street from Keller Street to Lincoln Way West <br />Wellington Street from Keller Street to Elwood Avenue <br />Bulla Street from Illinois Street to Kenmore Street <br />Kenmore Street from Keller Street to Elwood Avenue <br />3. The Contractor shall preserve and protect all surrounding property, structures, tenants, visitors and <br />their property from damage caused by the Contractor's operations. <br />XVIII. ASPHALT MICROSt1RFACING <br />A. Prevailing Specifications: 2022, INDOT Standard Specifications Sections 411, 902 <br />B. Additions: <br />1- Asphalt micro -surface material shall meet the standard specifications of ASTM D80991D8099M-17. <br />2. The Contractor shall be responsible for all surface preparation necessary to meet the performance <br />requirements for warranted micro -surfacing. All castings and detector housings shall be protected <br />prior to the application of material in accordance with INDOT 404.07, except that raised pavement <br />markers shall be removed. There will be no direct payment for this work. <br />3. Cracks in the pavement in excess of 1/4 in. width shall be filled in accordance with INDOT 408 prior <br />to placement of warranted micro -surfacing. There will be no direct payment for this work. <br />4. Existing curb faces, approaches, stormwater inlets, grass, and other features subject to <br />coordination with the Engineer shall be protected from and kept clean of all asphalt micro -surface <br />material. <br />5. Squeegees, brushes, and truck -mounted applicators shall be permitted for this work. Only <br />application by hand squeegee or brush shall be used in the vicinity of sensitive features as identified <br />in XVIIIA to prevent contamination. <br />6. Asphalt micro -surface shall not be applied when ambient temperature is below 50'F nor when <br />ambient temperature is expected to drop below 50°F within 24 hours of application. <br />7. Asphalt micro -surface shall be applied in two coats. The application rate of each coat shall be <br />between 30 to 40 square feet per gallon. <br />8. The first coat of micro -surface shall be dry prior to application of the second coat. <br />9. Existing pavement markings, including but not limited to painted crosswalks and stop lines, where <br />paved over by asphalt micro -surface, shall be reapplied with traffic paint. There will be no direct <br />payment for this work. <br />10. All incidental work, including but not limited to surface preparation, inlet and casting protection, and <br />pavement markings, shall be included in the cost of the asphalt microsurfacing pay item: <br />ASPHALT MICROSURFACING..................................................... _.................. SYD <br />XIX. PLANS <br />A. Prevailing Specifications: City of South Bend Design and Construction Standards <br />S. Additions: <br />1. The plans consist of 1 Sheets delineating project limits for all divisions. <br />2. The work shall conform to the plans. <br />3. The drawings are schematic in nature. <br />4. The CONTRACTOR is responsible for estimating dimensions and quantities of materials. <br />5. In the event that the Special Provisions and the Plans conflict, the Special Provisions shall govern. <br />Version 2/1412022 Page - 6 Public Works Quote <br />