My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - 2022 Curb and Sidewalk, Round I Proj No. 122-001 - Selge Construction Co., Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2022
>
Opening of Bids
>
Opening of Bids - 2022 Curb and Sidewalk, Round I Proj No. 122-001 - Selge Construction Co., Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2022 2:40:39 PM
Creation date
7/12/2022 2:38:05 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
7/12/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SLUSSERS <br />SPECIAL CONDITIONS <br />Concerning the Attached Quotation <br />Quote Number: 2022111 <br />STANDARD NOTATIONS: <br />1. Special note concerning seeding: Slussees will install seed year-round. However, we will not guarantee <br />seeding performed May 15th through August 15th, and October 1 through March 1. Seeding during this <br />period is very risky due to extreme climatic conditions (heat/drought/cold/etc.) This note does not apply <br />to prairie or wetland seeding unless specified otherwise. <br />2. This quote is valid for a period of 60 days. <br />3. Lawn maintenance to include mowing or spraying is not included in this quotation. <br />4. Topsoil, topsoil placement and any necessary amendments are not included in this quotation. <br />5. Quantities on this quotation are approximate. Areas will be measured and invoiced per unit prices. <br />6. Performance & Payment bonds are available but not included in this quotation. <br />7. Removal of rocks, debris and existing vegetation is not included in this quotation. <br />8. Seeding or sodding off right-of-way or outside of the construction limits is not included in this quotation. <br />9. Inorganic and Organic soil amendments are not included in this quotation. <br />10. Seeding partial price includes special Kentucky Bluegrass Lawn mix, fertilizer, and straw or paper mulch, and <br />watering for 30 days only. Topsoil, topsoil placement, mowing, or erosion blanket not included. <br />11. Tree price includes supplying and installing 2" - 2.5" Caliper size tree, staking, hardwood bark mulch, <br />watering for 30 days, and 1 year warranty. <br />12. Tree price does not include supplying or installing topsoil, planting soil, or engineering soil. <br />13. Clearing, grubbing, removal of existing landscaping, vegetation, or debris is not included in this quotation. <br />14. Maintenance or warranty bond for seeding or trees is not included in this quotation. <br />15. Indiana State Sales Tax has not been included in pricing. <br />16. Traffic control is the responsibility of the contractorlowner. <br />
The URL can be used to link to this page
Your browser does not support the video tag.