Laserfiche WebLink
•�1 <br />BID/PROPOSAL Ft� <br />J CITY OF SOUTH BENDProject Name: 2022 Curb and Sidewalk Construction — Round 1 <br />Project Number: <br />For Bids Due: <br />122-001 <br />July 1211, 2022 <br />Contractor Name: Selge Construction Co., Inc. <br />DIVISION 4 <br />Item <br />No. <br />Description <br />Qty <br />Unit <br />Unit Price <br />Total <br />Amount <br />1 <br />CONCRETE SIDEWALK, REMOVE <br />645 <br />SY <br />$85.75 <br />$55,308.75 <br />2 <br />CONCRETE SIDEWALK, 4 -IN <br />640 <br />SY <br />$96.00 <br />$61,440.00 <br />3 <br />CONCRETE CURB, REMOVE <br />205 <br />LF <br />$131.75 <br />$27,008.75 <br />4 <br />5 <br />CONCRETE CURB, MODIFIED <br />CONCRETE APPROACH, REMOVE <br />205 <br />LF <br />$131.75 <br />$27,008.75 <br />31 <br />SY <br />$58.25 <br />$1,805.75 <br />6 <br />GRAVEL APPROACH, REMOVE <br />12 <br />SY <br />$25.00 <br />$300.00 <br />7 <br />PCCP FOR APPROACHES, 6 -IN <br />47 <br />SY <br />$203.00 <br />1$9,541.00 <br />8 <br />CURB RAMP, REMOVE <br />16 <br />SY <br />$48.50 <br />$776.00 <br />9 <br />PAIRED PERPENDICULAR CURB RAMP <br />21 <br />SY <br />$510.00 <br />$10,710.00 <br />10 <br />TOPSOIL AND SEEDING <br />855 <br />SY <br />$25.60 <br />$21,888.00 <br />11 <br />TREE, REMOVE, 10 -IN <br />TREE, REMOVE, 18 -IN <br />1 <br />EA <br />$535.00 <br />$535.00 <br />$2,520.00 <br />12 <br />3 <br />EA <br />$840.00 <br />13 <br />TREE, REMOVE, 30 -IN <br />5 <br />EA <br />$1,450.00 <br />$7,250.00 <br />14 <br />TREE, REMOVE, 48 -IN <br />2 <br />EA <br />$2,575.00 <br />$5,150.00 <br />15 <br />STUMP, REMOVE <br />2 <br />EA <br />$375.00 <br />$750.00 <br />16 <br />PLANT, DECIDUOUS TREE, SINGLE <br />STEM. 2 -IN TO 2.5 -IN <br />23 <br />EA <br />$795.00 <br />$18,285.00 <br />DIVISION 4 TOTAL $250,277.00 <br />Version 09/29/2021 Contractor's Bid for Public Works - 10 <br />