Laserfiche WebLink
BID/PROPOSAL <br />CITY OF SOUTH BEND <br />Project Name: 2022 Curb and Sidewalk Construction — Round I <br />Project Number: <br />For Bids Due: <br />Contractor Name: <br />DIVISION 4 <br />122-001 <br />July 12t', 2022 <br />Rieth Riley Construction <br />Item <br />No. <br />Description <br />Qty <br />Unit <br />Unit Price <br />Total <br />Amount <br />1 <br />CONCRETE SIDEWALK, REMOVE <br />645 <br />SY <br />$33.00 <br />$21)285.00 <br />2 <br />CONCRETE SIDEWALK, 4 -IN <br />640 <br />SY <br />$101.50 <br />$64,960.00 <br />3 <br />CONCRETE CURB, REMOVE <br />205 <br />LF <br />$35.00 <br />$7,175.00 <br />4 <br />CONCRETE CURB, MODIFIED <br />205 <br />LF <br />$92.50 <br />$18,962.50 <br />5 <br />CONCRETE APPROACH, REMOVE <br />31 <br />SY <br />$106.50 <br />$3,301.50 <br />6 <br />GRAVEL APPROACH, REMOVE <br />12 <br />SY <br />$137.25 <br />$1,647.00 <br />7 <br />PCCP FOR APPROACHES, 6 -IN <br />47 <br />SY <br />$137.00 <br />$6,439.00 <br />8 <br />CURB RAMP, REMOVE <br />16 <br />SY <br />$212.50 <br />$3,400.00 <br />9 <br />PAIRED PERPENDICULAR CURB RAMP <br />21 <br />SY <br />$620.00 <br />$13;020.00 <br />10 <br />TOPSOIL AND SEEDING <br />855 <br />SY <br />$5.10 <br />$4,360.50 <br />11 <br />TREE, REMOVE, 10 -IN <br />1 <br />EA <br />$624.50 <br />$624.50 <br />12 <br />TREE, REMOVE, 18 -IN <br />3 <br />EA <br />$824.50 <br />$2,473.50 <br />13 <br />TREE, REMOVE, 30 -IN <br />5 <br />EA <br />$3,224.50 <br />$16,122.50 <br />14 <br />TREE, REMOVE, 48 -IN <br />2 <br />EA <br />$41724.50 <br />$9,449.00 <br />15 <br />STUMP, REMOVE <br />2 <br />EA <br />$250.00 <br />$500.00 <br />16 <br />-LAN 1 , U--U1L)UUUZj I SI NULL <br />:-'LAN <br />2-IN TO 2.5 -IN <br />23 <br />EA <br />10 1 20z). UU <br />DIVISION 4 TOTAL $192,005.00 <br />Version 09/29/2021 Contractor's Bid for Public Works - 10 <br />