My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - 2022 Curb and Sidewalk, Round I Proj No. 122-001 - Premium Concrete Services, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2022
>
Opening of Bids
>
Opening of Bids - 2022 Curb and Sidewalk, Round I Proj No. 122-001 - Premium Concrete Services, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2022 2:33:44 PM
Creation date
7/12/2022 2:32:17 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
7/12/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BID/PROPOSAL ylr <br />CITY OF SOUTH BEND _ <br />Project Name: 2022 Curb and Sidewalk Construction — Round 1 <br />Project Number: 122-001 <br />For Bids Due: July 121h, 2022 <br />Contractor Name: FU?!tZme l e0AJG1ZE7r_ 9109 rXZ5 <br />DIVISION 2 <br />Item <br />No. <br />I Description <br />oty <br />Unit <br />Unit Price <br />Total <br />Amount <br />1 <br />CONCRETE SIDEWALK, REMOVE <br />300 <br />SY <br />2 <br />CONCRETE SIDEWALK, 4 -IN <br />330 <br />SY <br />3 <br />CONCRETE CURB, REMOVE <br />1105 <br />LF <br />4 <br />CONCRETE CURB, MODIFIED <br />1110 <br />LF <br />5 <br />CONCRETE APPROACH, REMOVE <br />34 <br />SY <br />6 <br />GRAVEL APPROACH, REMOVE <br />31 <br />SY <br />7 <br />BRICK APPROACH, REMOVE <br />12 <br />SY <br />8 <br />PCCP FOR APPROACHES, 6 -IN <br />81 <br />SY <br />9 <br />CURB RAMP, REMOVE <br />77 <br />SY <br />10 <br />ONE-WAY PERPENDICULAR CURB RAMP <br />30 <br />SY <br />11 <br />PAIRED PERPENDICULAR CURB RAMP <br />47 <br />SY <br />12 <br />TOPSOIL AND SEEDING <br />485 <br />SY <br />13 <br />TREE, REMOVE, 30 -IN <br />1 <br />EA <br />14 <br />STUMP, REMOVE <br />4 <br />EA <br />15 <br />PLANT, DECIDUOUS TREE, SINGLE <br />STEM, 2 -IN TO 2.5 -IN <br />7 <br />EA <br />DIVISION 2 TOTAL NO Uhf) <br />Version 09/29/2021 Contractor's Bid for Public Works - 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.