Laserfiche WebLink
deemed to have 00ellfred whim tl;i-. average flaw rate for si�E (6) eanseetifive manths exeoedq <br />thea a«t Flew -ate by at least three hundred ten (31 0) gallons r day. <br />C47 L-1 For striaetidfese apartments,eendeminitims, <br />mobile heffte <br />eoffwnunities), eaa1, :«A:.AAttal linit shall be one (1) ERU. For all ether non-residential types <br />of structures, the ERU calculation shall be based upon the ratio of Average Daily Wet.. <br />water and sewer use values as eomputed pursuant to provided in 327 IAC 3-6-11 in <br />relationship to divided by three hundred ten (310) gallons perdu. For structures not listed <br />in 327 IAC 3-6-11, the ERU shall be calculated as the relationship between the Average <br />Daily Flow reported in the sewer capacity certification for the structure and three hundred <br />then (3 10) gallons per day. described in the Board of Works Resolution No. 20-2017. For <br />mixed use structures, which include residential and non-residential units, the ERU <br />calculation shall be based on the addition of the number of residential units and the water <br />and sewer use values provided in 327 IAC 3-6-11 for the non-residential units. <br />(4) For parcels with an existing connection to City sewer seeking to redevelop the property, a <br />System Development Charge will be collected if the redevelopment necessitates a larger water <br />meter size to accommodate increased flow. The System Development Charge will be <br />calculated using meter size equivalency factors shown below. The difference between the <br />existing meter size equivalency factor and new meter size equivalency factor will be collected. <br />For example, if the existingdevelopment on a parcel has a 5/8 in meter, and the new <br />development will require a 1 in meter, the SDC will be $2,863 (SDC for 1 in) - $1,145 (SDC <br />for 5/8 in) = $1,718. There will not be a credit given if the meter size is reduced. Existing <br />water tap size will be used if the meter is not available. Upon application for connection, the <br />new meter size will need to be determined. <br />Meter Size <br />Eauivalencv Factor <br />SDC Charge <br />5/8 in. <br />1.0 <br />$1,145 <br />'/ in. <br />1.5 <br />$1,718 <br />1 in. <br />2.5 <br />$2,863 <br />1 1/z in. <br />5.0 <br />$5,725 <br />2 in. <br />8.0 <br />$9,160 <br />3 in. <br />15.0 <br />$17,175 <br />4 in. <br />25.0 <br />$28,625 <br />6 in. <br />50.0 <br />$57,250 <br />8 in. <br />80.0 <br />$91,600 <br />10 in. <br />115.0 <br />$131,675 <br />(5) For residential infill developments of five (5) or fewer residential units, the System <br />Development Charge shall be waived. For residential infill developments consisting of five <br />(5) units or more, whether developed at one time or over a period of time, the System <br />Development Charge shall be waived for infill residential housing units constructed by not- <br />for-profit development companies or supported by low-income housing tax credits. <br />(5) F -s skit ,. a with greater than twenty (20) ER -Us nle elated pursuant t,. t&eeetio I^` <br />C lI. <br />F thissection, h ERU shall he adjosted based upon the Peaking Faeter a «tike.] <br />