My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No 1 to PSA - Adding Full CSO Storage Tank Proj No. 121-071 – American Structurepoint, Inc. - TABLED
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2022
>
Agreements/Contracts/Proposals/Addenda
>
Amendment No 1 to PSA - Adding Full CSO Storage Tank Proj No. 121-071 – American Structurepoint, Inc. - TABLED
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2022 8:07:20 AM
Creation date
6/22/2022 8:07:04 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
5/24/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />OPINION OF PROBABLE PROJECT COSTS <br />SAGE PLAN <br /> <br /> <br /> <br /> <br />Improvement <br /> <br /> <br />2020 SAGE Plan <br /> <br />Base Construction <br />($ millions) <br />With Construction <br />Contingency <br />($ millions) <br />With Contingency <br />and Engineering <br />($ millions) <br />WWTP Improvements <br />WWTP Improvements Expansion of the South Bend WWTP to provide peak wet weather <br />capacity of 100 mgd. Cost based on ARCADIS estimates. <br />$ 18.94 $ 24.62 $ 29.55 <br />Storage Facilities <br />WWTP Storage, Site Piping and <br />Controls <br />Equalization basin and dewatering pumping station. Construction <br />Contingency = 20% based on expanded conceptual design. <br />$ 19.32 $ 23.18 $ 27.82 <br />Re-routing of existing sewers to accommodate proposed equalization <br />basin. <br />$ 0.66 $ 0.86 $ 1.03 <br />Brownfield Storage Tank Below grade retention treatment basin and pumping station with RTC <br />gate and provisions for screening, disinfection/dechlorination of <br />overflow. Cost based on storage cost curve. 30% construction <br />contingency applied given lack of conceptual design details <br />$ 19.32 $ 25.11 $ 30.13 <br />Memorial Park RTB Below grade retention treatment basin and pumping station with <br />provisions for screening, disinfection/dechlorination of overflow. Cost <br />based on storage cost curve plus allowance for effluent pump station. <br />$ 37.72 $ 45.26 $ 54.32 <br />Memorial Park Consolidation Sewers <br />and Controls <br />Large diameter sewers to collect and convey overflow from CSO Basins <br />031, 033, 035, 036, 037 to Memorial Park RTB; Segment from CSO 037 <br />to tank increased to 78" diameter (2625 lf). <br />$ 16.24 $ 21.11 $ 25.33 <br />Randolph-Sampson RTB and Site <br />Piping <br />Below grade retention treatment basin and pumping station with <br />provisions for screening, disinfection/dechlorination of overflow. <br />Construction Contingency = 20% based on expanded conceptual design <br />$ 33.76 $ 40.51 $ 48.62 <br />90" diameter inlet and outlet sewers for Randolph-Sampson RTB $ 0.53 $ 0.69 $ 0.82 <br />Conveyance Facilities <br />South Shore Interconnect Sewer 84" diameter interconnecting sewer from Michigan St LS to <br />downstream end of River Crossing #5. Collects overflow from CSO <br />Basins 006, 007, 008, 010, 011 and allows River Crossing #4 and the <br />Michigan Street LS to be abandoned. <br />$ 18.80 $ 24.44 $ 29.33 <br />River Crossing 2-3 Interconnect Sewer 36" diameter interconnecting sewer (reduced from 66") between CSO <br />14 and River Crossing #2 serving as both conveyance and storage <br />$ 3.20 $ 4.16 $ 5.00 <br />Interceptor Replacement 24" diameter replacement for existing interceptor from CSO 020 to CSO <br />019 (1,800 lf) <br />$ 1.22 $ 1.59 $ 1.90 <br />New River Crossing 48" diameter wet weather river crossing (500 lf) to direct excess flow <br />from south side of river to Memorial Park RTB; Use cost curve. <br />$ 5.50 $ 7.15 $ 8.58 <br />Interceptor Active Controls <br />Interceptor Control Upstream of River <br />Crossing #2 <br />Actively controlled interceptor isolation gate to regulate flow <br />downstream and detain excess in Memorial Park RTB <br />$ 0.16 $ 0.21 $ 0.25 <br />Sluice Gate at CSO 18 Regulator <br />Structure <br />Actively controlled modulating sluice gate operated to make effective <br />use of storage in Basin 018 trunk sewer <br />$ 0.16 $ 0.21 $ 0.25 <br />Throttle Control at CSO 022 Actively controlled sluice gate on capture throttle to prevent overflows <br />at CSO 48 near River Crossing #1 <br />$ 0.16 $ 0.21 $ 0.25 <br />Local Collection System Capacity <br />Basin CSO 040, 041 Separation Sewer 15" new storm sewer (975 lf), 18" new storm sewer (650 lf), 24" new <br />storm sewer (650 lf) on Pleasant Avenue; 24" new storm sewer (700 lf) <br />on Northside Blvd. <br />$ 1.80 $ 2.34 $ 2.81 <br />Regulator and Throttle Modifications <br />CSO 001 Throttle Capacity <br />Improvement <br />Increase dry weather throttle pipe capacity $ 0.04 $ 0.05 $ 0.06 <br />CSO 010 Throttle Capacity <br />Improvement <br />Increase throttle pipe capacity to maximize diversion to South Shore <br />Interconnect Sewer (550 lf of 36" diameter sewer, 775 lf of 27" <br />diameter sewer), Construct new diversion structure at Michigan St and <br />Bartlett St <br />$ 1.07 $ 1.39 $ 1.67 <br />CSO 011 Regulator Improvements and <br />Diversion Sewer <br />CSO 011 regulator modifications, weir adjustments, and 27" diameter <br />relief sewer (2,250 lf) from intra-system diversion structure on 60" <br />trunk sewer upstream of existing CSO 011B location to Michigan St and <br />Bartlett St <br />$ 1.90 $ 2.47 $ 3.21 <br />CSO 019 Throttle Capacity <br />Improvement <br />Increase throttle pipe capacity to maximize diversion to South Shore <br />Interconnect Sewer (650 lf of 24" diameter sewer) <br />$ 0.44 $ 0.57 $ 0.69 <br />Regulator Modifications for Memorial <br />Park Consolidation Sewer <br />Modifications to regulators for CSO 031, 033, 035, 036, 037, 060 $ 0.10 $ 0.12 $ 0.15 <br />Regulator Modifications for Randolph- <br />Sampson RTB <br />Modification to regulator at CSO 022 $ 0.06 $ 0.08 $ 0.10 <br />Regulator/Throttle Improvements <br />Downstream of East Race <br />Modifications to regulators/throttles at CSOs 003, 004, 006, 007, 025, <br />026, 027, 028 <br />$ 0.13 $ 0.17 $ 0.20 <br />CSO 029 Lift Station Modification Increase lift station capacity to 250 gpm (0.55 mgd) $ 0.50 $ 0.65 $ 0.85 <br />Regulator/Throttle Improvements <br />Upstream of East Race <br />Modifications to regulators/throttles at CSOs 014, 018, 021, 040 $ 0.06 $ 0.08 $ 0.10 <br />Green Stormwater Infrastructure <br />CSO Basin 010 GSI Improvements Sewer Separation, Green Alley Improvements, Rain Barrel Program $ 0.65 $ 0.84 $ 1.01 <br />CSO Basin 019 GSI Improvements Green Alley Improvements, Intersection Dry Wells $ 0.67 $ 0.88 $ 1.05 <br />CSO Basin 039, 040 GSI Improvements GSI unit drain improvements along Pleasant Avenue $ 0.50 $ 0.65 $ 0.85 <br />2020 SAGE Plan $ 275.91
The URL can be used to link to this page
Your browser does not support the video tag.