Laserfiche WebLink
Page 3 <br />(Exhibit A – Engineer’s Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />10. Furnish three (3) review copies of the Report and any other deliverables to Owner within <br />90 calendar days of the Effective Date and review it with Owner. Within 14 calendar days <br />of receipt, Owner shall submit to Engineer any comments regarding the Report and any <br />other deliverables. Furnish one (1) digital copy of all Report Documents and Survey <br />documentation. <br />11.Revise the Report and any other deliverables in response to Owner’s comments, as <br />appropriate, and furnish three (3) copies of the revised Report and any other deliverables to <br />the Owner within seven (7) calendar days of receipt of Owner’s comments. <br />B.Engineer’s services under the Study and Report Phase will be considered complete on the date <br />when the revised Report and any other deliverables have been delivered to Owner. <br />A1.02 Preliminary Design Phase <br />A.After acceptance by Owner of the Report and any other deliverables, selection by Owner of a <br />recommended solution and indication of any specific modifications or changes in the scope, extent, <br />character, or design requirements of the Project desired by Owner, and upon written authorization <br />from Owner, Engineer shall: <br />1.Prepare Preliminary Design Phase documents consisting of final design criteria, preliminary <br />drawings, outline specifications, and written descriptions of the Project. <br />2.Perform hydraulic analysis on the proposed improvements including sizing of the EQ Basin. <br />3.Conduct a preliminary equipment selection. <br />4.Evaluate and determine initial electrical, instrumentation, and controls for operations of the <br />system. <br />5.Determine intial structural design of the EQ Basin and near surface facilities. <br />6.Determine re-alignment plans and prolifes of the existing interceptor. <br />7.Based on the information contained in the Preliminary Design Phase documents, prepare a <br />revised opinion of probable Construction Cost, and assist Owner in collating the various <br />cost categories which comprise Total Project Costs. <br />8. Furnish three (3) review copies of the Preliminary Design Phase documents at the 30% and <br />60% design stages and any other deliverables to Owner within 90 calendar days for 30% <br />plans and 180 days for 60% plans of authorization to proceed with this phase, and review <br />them with Owner. Within 14 calendar days of receipt for each stage, Owner shall submit to <br />Engineer any comments regarding the Preliminary Design Phase documents and any other <br />deliverables. <br />9.Conduct review meetings with the Owner at 30% and 60 % design completion. <br />DocuSign Envelope ID: 1C4AA711-DA0B-418C-90FE-56D629C93881