Laserfiche WebLink
Manhour Fee Justification <br />Client:City of South Bend <br />Project Name: <br />Project No.:22-1121 <br />GT RR Wm at Greenlawn Ave <br />Manhour Justification Principle / Sr Proj MgrSr. Proj Engr / PM/ Sr. ConsultantSr Engr / Sr Dsgr / Sr Surv.Engr / Dsgr / SurvSr Tech /Sr ObservTechnician / ObservorAdmin2 Man Survey Crew1 Man Survey Crew Task Description Totals Total Fee <br />Task 1 Preliminary Design Phase 4 24 34 72 0 0 0 17 0 151 17,700$ <br />1 Topo Survey 16 2,400$ <br />2 Field calculations 4 420$ <br />3 UtilityLocates 2 210$ <br />4 Set Controls 1 150$ <br />5 Title Sheet 2 2 440$ <br />6 Index Sheet 2 2 440$ <br />7 Preliminary Typical Cross Sections 4 4 880$ <br />8 Preliminary MOT/Detour Map/Pedestrian plans Signage and note 8 8 1,760$ <br />9 Plan and Profile with Watermain Relocation 4 16 2,140$ <br />10 Configuration of curb ramps 0 -$ <br />11 Preliminary Erosion Control Plans 1 4 535$ <br />12 Preliminary Pavement Marking and Signage Plan 1 4 535$ <br />13 Miscellaneous details, driveway replacement table, structure <br />replacement table/ incidental work.1 4 535$ <br />14 Cross-Sections 2 6 860$ <br />15 Preliminary Quantity Calcs and Cost Estimates 2 4 650$ <br />16 Preliminary Permit Application- Rule 5 0 0 -$ <br />17 Preliminary Unique Special Provisions and Specifications 8 1,000$ <br />18 Project Management- Coordination with RR and City 12 1,500$ <br />19 Initiate Utility Coordination (Design Inquiry and Verification)4 4 880$ <br />20 QA/QC time 4 2 4 1,350$ <br />21 Virtual Mtg with City review / 1 visit PM/Designer 1 1 240$ <br />22 Compliance with City at 30% Review 1 2 4 775$ <br />-$ <br />22-1121 South Bend GTRR Wm - Greenlawn Fee NT.xlsx 1 of 3