Laserfiche WebLink
Page 1 <br />Exhibit C –Compensation Packet BC-1: Basic Services (other than RPR) – Lump Sum Method of Payment <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />SUGGESTED FORMAT <br />(for use with E-500, 2008 Edition) <br />This is EXHIBIT C, consisting of 3 pages, referred to <br />in and part of the Agreement between Owner and Engineer <br />for Professional Services dated June 7 , 2022 . <br />Payments to Engineer for Services and Reimbursable Expenses <br />COMPENSATION PACKET BC-1: Basic Services – Lump Sum <br />Article 2 of the Agreement is supplemented to include the following agreement of the parties: <br />ARTICLE 2 – OWNER’S RESPONSIBILITIES <br />C2.01 Compensation for Basic Services (other than Resident Project Representative) – Lump Sum <br />Method of Payment <br />A. Owner shall pay Engineer for Basic Services set forth in Exhibit A, except for services of <br />Engineer’s Resident Project Representative, if any, as follows: <br />1. A Lump Sum amount of $ 65,166 based on the following estimated distribution of <br />compensation: <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />compensation amount for Engineer's services shall be appropriately adjusted. <br />period of service not exceeding months. If such period of service is extended, the <br />of Service:The compensation amount stipulated in Compensation Packet BC-1 is conditioned on a <br />estimate of the percentage of the total services actually completed during the billing period.Period <br />B. The portion of the Lump Sum amount billed for Engineer’s services will be based upon Engineer’s <br />account for labor, overhead, profit, and Reimbursable Expenses. <br />Consultants, if any. Appropriate amounts have been incorporated in the Lump Sum to <br />3. <br />Sum amount unless approved in writing by the Owner. <br />herein to be consistent with services actually rendered, but shall not exceed the total Lump <br />Engineer may alter the distribution of compensation between individual phases noted2. <br />f. Post-Construction Phase $ N/A <br />e. Construction Phase $ <br />d. Bidding and Negotiating Phase $ <br />c. Final Design Phase $ <br />b. Preliminary Design Phase $ <br />a. Study and Report Phase $ N/A <br /> 2,000.00 <br /> 2,232.00 <br /> 38,374.00 <br />22,560.00 <br />The Lump Sum includes compensation for Engineer’s services and services of Engineer’s <br />12