Page 1 of 1 <br />2020.01456 <br />This is Attachment 1, consisting of 1 page, to Amendment <br />No. 1. <br />Modifications <br />1.Part A1.07, Schedule, of Exhibit A is modified as follows: <br />The proposed design and bid services will be completed within 18 months after Notice to <br />Proceed (NTP). A breakdown of the preliminary schedule is as follows in accordance with the <br />following schedule: <br /> Contract Award October 12, 2021 <br />Study Phase October 13, 2021 – December 31. 2021 <br /> Preliminary Design January 1, 2022 – June 30, 2022 <br />June 15, 2022- December 15, 2022 <br /> Final Design July 1, 2022 – December 31, 2022 <br />January 1, 2023 – June 30, 2023 <br />Permitting and Bidding January 1, 2023 – April 1, 2023 <br />July 1, 2023 – August 31, 2023 <br />Construction Notice to Proceed June 1, 2023 October 1, 2023 <br />2.Part C2.01.A.1 of Compensation Packet BC-1:Basic Services – Lump Sum is modified as follows: <br />A.Owner shall pay for Basic Services set forth in Exhibit A, except for services of Engineer’s <br />Resident Project Representative, if any, as follows: <br />1.A Lump Sum amount of $203,735.00 $2,354,023.00 based on the following estimated <br />distribution of compensation: <br />a.Study and Report Phase $203,735.00 <br />b.Preliminary Design Phase TBD $1,114,384.50 <br />c.Final Design Phase TBD $686,880.50 <br />d.Bidding and Negotiating Phase TBD $49,540.00 <br />e.Construction Phase (admin)TBD $299,483.00 <br />f.Post-Construction Phase TBD <br />2.Total compensation due to Engineer under the Agreement and Amendment No. 1 is $2,354,023.00, <br />an increase of $2,150,288.00. <br />DocuSign Envelope ID: B46DFD09-C1A4-4BFC-B33B-9C3C8DBD4E09