My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes - Installation of Electric Vehicle Supply Equipment Proj No. 121-011 - Koontz-Wagner Services
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2022
>
Opening of Quotations/Proposals
>
Opening of Quotes - Installation of Electric Vehicle Supply Equipment Proj No. 121-011 - Koontz-Wagner Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2022 2:24:32 PM
Creation date
6/14/2022 2:24:26 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
6/14/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Tuesday, June 14, 2022 <br /> 3801 Voorde Dr, Ste B 5330 Distribution Dr 1864 N McCullough St <br /> South Bend, IN 46628 Fort Wayne, IN 46825 Lima, OH 45801 <br /> 800-345-2051 260-484-0313 419-228-1325 <br /> www.Koontz-Wagner.com Page 2 of 4 <br /> <br />Wayne St. Parking Garage: <br /> <br />• Provide and Install (2) 40A 2 pole breakers in existing panel to feed new charging stations. <br />• Provide and install conduit and wire to feed (2) single plug wall mounted vehicle charging <br />stations. <br />• City of South Bend to provide (2) ZEFNET-40-CWS charging stations. <br />I have excluded: <br />• 7% IN sales tax <br />• Any curbing, bollards, or road marker painting. <br /> <br />Quoted Amount ..............................................................................................$5,687.41 <br /> <br />Leighton Parking Garage: <br /> <br />• Provide and Install (1) 100A 120/208V three phase sub panel with (2) 40A 2 pole breakers <br />• Provide and install conduit and wire to feed (2) single plug wall mounted vehicle charging <br />stations. <br />• City of South Bend to provide (2) ZEFNET-40-CWS charging stations. <br />I have excluded: <br />• 7% IN sales tax <br />• Any curbing, bollards, or road marker painting. <br /> <br />Quoted Amount ..............................................................................................$9,069.68 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.