My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-13-2022 Agenda Packet
sbend
>
Public
>
Common Council
>
Common Council Agenda Packets
>
2022
>
06-13-2022
>
06-13-2022 Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2022 8:32:45 PM
Creation date
6/9/2022 8:30:59 PM
Metadata
Fields
Template:
City Council - City Clerk
City Counci - Date
6/13/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
4) (3) <br />eeffffnunifies), ea& individual unit shell beeone (1 ) ERU-. For all ethef non-residential types <br />of structures, the ERU calculation shall be based upon the retie of ver -age Daily Fie,.. <br />water and sewer use values.as eempe4ed persuant to provided in 327 IAC 3-6-11 in <br />relationship to divided by three hundred ten (3 10) gallons per day. For structures not listed <br />in 327 IAC 3-6-11, the ERU shall be calculated as described by in the Board of Public <br />Works Resolution No. 20-2017. the Miership between the Average Daily zloty repoEtea <br />in the water e,.,iaet , oe,difiraf „rtie« the stmete and three hundred ten (3 10) velem <br />C J <br />day: For mixed use structures, which include residential and non-residential units, the ERU <br />calculation shall be based on the addition of the number of residential units and the water <br />and sewer use values provided in 327 IAC 3-6-11 for the non-residential units. <br />For parcels with an existing connection to City water seeking to redevelop the property, a <br />System Development Charge will be collected if the redevelopment necessitates a larger <br />water meter size to accommodate increased flow. The System Development Charge will <br />be calculated using meter size equivalency factors shown below. The difference between <br />the existing meter size equivalency factor and new meter size equivalency factor will be <br />collected. For example, if the existingdevelopment on a parcel has a 5/8 in meter, and the <br />new development will require a 1 in meter, the SDC will be $1,187.50 (SDC for 1 in) - <br />475 (SDC for 5/8 in) = $712.50. There will not be a credit given if the meter size is <br />reduced. Existing water tap size will be used if the meter size is not available. Upon <br />application for construction, the new meter size will need to be determined. <br />Meter Size Eauivalencv Factor SDC Charge <br />5/8 in. 1.0 475 <br />in. 1.5 712.50 <br />1 in. 2.5 1,187.50 <br />1 % in. 5.0 2,375 <br />2 in. 8.0 3,800 <br />3 in. 15.0 7,125 <br />4 in. 25.0 11,875 <br />6 in. 50.0 23,750 <br />8 in. 80.0 38,000 <br />10 in. 115.0 54,625 <br />5) For residential infill developments of five (5) or fewer residential units, the System <br />Development Charge shall be waived. For residential infill development of five (5) units or <br />more, whether developed at one time or over a period of time, the System Development <br />Charge shall be waived for infill residential housing units constructed by not-for-profit <br />development companies or supported by low-income housing tax credits.
The URL can be used to link to this page
Your browser does not support the video tag.