Laserfiche WebLink
2833 S. 11th Street, <br />Niles, MI 49120 <br />Phone: 269-684-0842 <br />Fax: 269-684-0846 <br />______________________________________________________________________________ <br />Page 1 of 1 <br />PROPOSAL <br />April 21, 2022 <br />City of South Bend <br />Dept. of Public Works <br />Attn: Mr. Zach Hurst, P.E. <br />227 W. Jefferson Blvd., Ste. 1316 <br />South Bend, IN 46601 <br />RE: INDOT 37502 – AUTEN ROAD TRAIL <br />FIRE HYDRANT RELOCATIONS <br />Zach, <br />Thank you for the opportunity to provide you with a proposal to relocate five (5) existing <br />hydrants along Auten Road that are currently in the proposed bike trail. The new hydrants, pipe, <br />and fittings for the relocation will be supplied by the City of South Bend, Water Department. The <br />hydrants to be relocated are as follows: <br />Station Distance (ft) <br /> 124+11 12 <br /> 135+93 2.5 <br /> 142+81 12 <br /> 146+46 3.25 <br /> 148+95 2 <br />Total Cost to Relocate Hydrants: 5 ea. x $3,882.00/ea. = $19,410.00 <br />Notes: <br />1. City of South Bend to supply new hydrants, pipe, and fittings. <br />2.Selge to supply labor, equipment, stone, backfill, and MOT. <br />3.Proposal assumes complete shutdown of hydrant. <br />4.Proposal based on relocation plan date 4/4/2022. <br />5.Old hydrants to be returned to the South Bend Water Department. <br />Feel free to call with any questions. Thank you again for the opportunity. <br />Respectfully submitted: <br />Selge Construction Co., Inc. City of South Bend <br />Robert P. Kuhns, PE Authorized Signature <br />Project Engineer <br />Exhibit B