Laserfiche WebLink
10'-4"MAINTENANCE <br />146 20'-0"1'-2" <br />WALKABLE CEILING <br />STEEL JOISTS -SEE <br />STRUCTURAL DRAWINGS <br />EXISTING MEMBRANE <br />ROOF <br />MECHANICALLY FASTENED <br />ROOF ON RIGID INSULATION <br />AND METAL DECK <br />EXISTING STEEL ROOF <br />STRUCTURE <br />CONCRETE -SEE <br />STRUCTURAL DRAWINGS <br />INSULATED METAL <br />PANEL CEILING <br />INSULATED METAL <br />WALL PANELS <br />MECHANICALLY FASTENED <br />ROOF ON RIGID INSULATION <br />AND METAL DECK <br />OVERHEAD COILING DOOR -BEYOND <br />SEE DOOR SCHEDULE <br />MECHANICALLY FASTENED <br />ROOF ON 6" RIGID INSULATION <br />AND METAL DECK <br />2 HOUR RATED TILT-UP <br />CONCRETE WALL PANELS <br />8'-0"1 <br />SB-A204 <br />12" SPLIT FACE CONCRETE BLOCK <br />INSULATE ALL NON-GROUTED CORES <br />CONCRETE FOUNDATION WALL <br />SEE STRUCTURAL DRAWINGS <br />CONCRETE SLAB <br />SEE STRUCTURAL DRAWINGS <br />CONCRETE SLAB ON <br />METAL DECK -SEE <br />STRUCTURAL DRAWINGS <br />CONCRETE BLOCK <br />SB-A206 <br />2 <br />STEEL BEAM -SEE <br />STRUCTURAL DRAWINGS <br />161011 <br />22'-8"PRE-MANUFACTURED TANKER <br />UNLOAD PLATFORMSUSPENDED ACOUSTICAL <br />CEILING <br />148B <br />147B <br />142A <br />142B <br />MECHANICAL <br />148 <br />MECHANICAL <br />MEZZANINE <br />201 <br />STEEL LADDER TO <br />ROOF HATCH BEYOND <br />EX. MAINTENANCE <br />ROOM <br />145 <br />NEW STEEL GUARDRAIL <br />AT 42" ABOVE MEZZANINE <br />MATCH EXISTING FINISH <br />ALUMINUM CEILING SUPPORT <br />FLANGE <br />SUPPORT HANGER ROD <br />8'20'-0"MAKING <br />149 <br />WALKABLE CEILING <br />STEEL JOISTS -SEE <br />STRUCTURAL DRAWINGS <br />MECHANICALLY FASTENED <br />ROOF ON RIGID INSULATION <br />AND METAL DECKINSULATED METAL <br />WALL PANELS <br />EXISTING MEMBRANE <br />ROOF <br />MECHANICALLY FASTENED <br />ROOF ON RIGID INSULATION <br />AND METAL DECK <br />EXISTING STEEL ROOF <br />STRUCTURE <br />CONCRETE SLAB -SEE <br />STRUCTURAL DRAWINGS <br />REMOVE PORTION OF <br />EXISTING CONCRETE <br />MEZZANINE FLOOR, DECK, <br />AND STRUCTURE <br />REMOVE EXISTING GUARD <br />RAIL <br />INSULATED METAL <br />PANEL CEILING <br />OVERHEAD COILING DOOR -BEYOND <br />SEE DOOR SCHEDULE <br />MECHANICALLY FASTENED <br />ROOF ON RIGID INSULATION <br />AND METAL DECK <br />SPLIT FACE CONCRETE BLOCK WALL <br />CONCRETE -SEE <br />STRUCTURAL DRAWINGS <br />1 <br />SB-A204 <br />31'-7 1/2"4'-0"PREFINISHED METAL GUTTER <br />PREFINISHED METAL COPING <br />TILT-UP CONCRETE <br />WALL PANEL <br />161011 <br />PROVIDE BENT PLATE <br />AROUND COLUMN, FILL <br />WITH CONCRETE -SEE <br />STRUCTURAL DRAWINGS <br />149B 142B <br />142A <br />ALUMINUM CEILING SUPPORT <br />FLANGE <br />SUPPORT HANGER ROD <br />PROJECT NUMBER: <br />jedson.com <br />One Centennial Plaza <br />705 Central Ave <br />Cincinnati, OH 45202 <br />P: 513.965.5999 <br />F: 513.965.5998 <br />THIS DRAWING AND ITS RELATED COPYRIGHTS, INTELLECTUAL PROPERTY RIGHTS AND TRADE SECRETS ARE THE PROPERTY OF JEDSON <br />ENGINEERING, INC. AND CONTAINS CONFIDENTIAL INFORMATION, WHICH SHALL NOT BE USED, COPIED OR DISCLOSED WITHOUT WRITTEN PERMISSION <br />OF JEDSON ENGINEERING, INC. ©2013 JEDSON ENGINEERING, INC. ALL RIGHTS RESERVED. <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />ABCDEFGHKLM <br />REVISIONS <br />ABCDEFGHJKLM <br />PROJ. NO.: <br />DRAWN BY: <br />CHECKED BY: <br />APPROVED BY: <br />SCALE:11/4/2021 1:10:19 PMApprover <br />Checker <br />Designer <br />200199 <br />McCORMICK & COMPANY <br />BUILDING SECTIONSSB-A203SB-A203 -I <br />200199 <br />1/4" = 1'-0"1 SECTION THRU MAKING 1 <br />1/4" = 1'-0"2 SECTION THRU MAKING 2 <br />3425 LATHROP ST. SOUTH BEND, INDIANA 46628 <br />NO DESCRIPTION DATE DB CB AB <br />B LAYOUT D 7/13/2021 DLR DLR <br />C LAYOUT E 8/3/2021 DLR DLR <br />D LAYOUT PROGRESS 8/11/2021 DLR DLR <br />E LAYOUT G 8/25/2021 DLR DLR <br />F REVISIONS 9/14/2021 DLR DLR <br />G GENERAL REVISIONS 9/20/2021 DLR DLR <br />H GENERAL REVISIONS 10/1/2021 DLR DLR <br />I ISSUED FOR REVIEW 11/01/2021 DLR DLR