Contract No:T -41189 INDIANA Date:04/19/2022 <br />Change Order No:001 Department of Transportation Page: 4 <br />Supplemental Description2: <br />0020 1801240 0020 805-11771 EACH 700.000 38.000 C Amount:$ 26,600.00 <br />Item Description:SIGNAL POLE, PEDESTAL, 16 FT <br />Supplemental Description1: <br />Supplemental Description2: <br />0021 1801240 0021 805-08475 LS 138,944.910 1.000 C Amount:$ 138,944.91 <br />Item Description:FLASHER MODERNIZATION <br />Supplemental Description1: <br />Supplemental Description2: <br />Total Value for Change Order 001 = $ 268,920.91 <br />Contract Completion Date Time Adjustment <br />Original Completion dt: 08/05/2022 Adj compl dt 10/04/2022 Adj No. of Days 60 <br />Explanation: The original scope of work for the School Zone Flashing Beacon project was the installation of 138 total beacons for 39 different <br />locations with city limits. During the design process, it was determined the original scope of work would exceed the budget by approximately <br />$500,000. The City informed INDOT of the estimated cost and proceeded to remove 38 beacons from the project prior to the letting in order to <br />ensure award after the December 2021 letting. Upon receiving bids, Michiana Contracting was under the revised estimate ($942,138.86) by <br />$200,000. This change order is to add back the originally removed flashing beacons to the scope of work. The 38 beacons will add the following <br />schools to the project: El Campito, Corpus Christi Parish School, Madison Primary Center, Marquette Primary, Marshall Intermediate Center, Our <br />Lady of Hungary Elementary, Riley High School, South Bend Junior Academy, St. John the Baptist School, and Studebaker Primary. All the <br />requested locations have approved environmental studies as part of the Stage III submittal work. The Contractor has agreed to add the 38 <br />beacons to the contract at the as bid unit contract prices. The locations were part of the original design and not a change in scope so the <br />additional costs will be participating. The INDOT PM is aware of the change and has given concurrence. <br />Whereas, the Standard Specifications for this contract provides for such work to be performed, the following change is recommended. <br />General or Standard Change Order Explanation <br />The original scope of work for the School Zone Flashing Beacon project was the installation of 138 total beacons for 39 different locations with <br />city limits. During the design process, it was determined the original scope of work would exceed the budget by approximately $500,000. The City <br />informed INDOT of the estimated cost and proceeded to remove 38 beacons from the project prior to the letting in order to ensure award after the <br />December 2021 letting. Upon receiving bids, Michiana Contracting was under the revised estimate ($942,138.86) by $200,000. This change <br />order is to add back the originally removed flashing beacons to the scope of work. The 38 beacons will add the following schools to the project: El <br />Campito, Corpus Christi Parish School, Madison Primary Center, Marquette Primary, Marshall Intermediate Center, Our Lady of Hungary <br />Elementary, Riley High School, South Bend Junior Academy, St. John the Baptist School, and Studebaker Primary. All the requested locations <br />have approved environmental studies as part of the Stage III submittal work. The Contractor has agreed to add the 38 beacons to the contract at <br />the as bid unit contract prices. The locations were part of the original design and not a change in scope so the additional costs will be <br />participating. The INDOT PM is aware of the change and has given concurrence. <br />Change Order Explanation for Specific Line Item <br />**************************************************************************************************************************** <br />It is the intent of the parties that this change order is full and complete compensation for the work describe above. <br />Notification and consent to this change order is hereby acknowledged. <br />Contractor:____________________________________________ Signed By:_____________________________________________ <br />Date:__________________________________________________ <br />*************************************************************************************************************************** <br />NOTE: Other required State and FHWA signatures will be obtained electronically through the SiteManager system.