My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 1 - School Zone Flashing Beacons Installation (38) Proj No. 117-075 - Michiana Contracting
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2022
>
Change Orders
>
Change Order No 1 - School Zone Flashing Beacons Installation (38) Proj No. 117-075 - Michiana Contracting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2022 2:30:45 PM
Creation date
4/26/2022 2:30:40 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
4/26/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Contract No:T -41189 Change Order No.: 001 <br />INDIANA Department of Transportation Page: 1 <br />Construction Change Order and Time Extension Summary <br />Contract Information Contract No.: T -41189 Letting Date:12/08/2021 <br />District:LAPORTE DISTRICT AE:Hauersperger, Steven PE/S:Kreeger, Scott Status:Draft <br />Change Order Information Change Order No.: 001 EWA: Y or Force Acct: N <br />Date Generated: 04/14/2022 Date Approved: 00/00/0000 <br />Reason Code: SCOPE CHANGES, Work Outside Const Limits <br />Description: Additional flashing beacons <br />Original Contract Amount $ 739,628.00 <br />Current Change Order Amount $ 268,920.91 Percent: 36.359 % <br />Total Previous Approved Changes $ 0.00 Percent: 0.000 % <br />Total Change To-Date $ 268,920.91 Percent: 36.359 % <br />Modified Contract Amount $ 1,008,548.91 <br />Time Extension Information <br />Date Initiated 00/00/0000 Date Completed 00/00/0000 <br />Original Contract Time SS Completion Date 08/05/2022 or SS Calendar/Work Days 0 <br />SP Date 00/00/0000 or SP Days <br />(SS = Standard Specification, SP = Special Provision) <br />Time Element Description: The original scope of work for the School Zone Flashing Beacon project was the <br />installation of 138 total beacons for 39 different locations with city limits. During the design process, it was <br />determined the original scope of work would exceed the budget by approximately $500,000. The City informed <br />INDOT of the estimated cost and proceeded to remove 38 beacons from the project prior to the letting in order to <br />ensure award after the December 2021 letting. Upon receiving bids, Michiana Contracting was under the revised <br />estimate ($942,138. 86) by $200,000. This change order is to add back the originally removed flashing beacons to <br />the scope of work. The 38 beacons will add the following schools to the project: El Campito, Corpus Christi Parish <br />School, Madison Primary Center, Marquette Primary, Marshall Intermediate Center, Our Lady of Hungary <br />Elementary, Riley High School, South Bend Junior Academy, St. John the Baptist School, and Studebaker Primary. <br />All the requested locations have approved environmental studies as part of the Stage III submittal work. The <br />Contractor has agreed to add the 38 beacons to the contract at the as bid unit contract prices. The locations were <br />part of the original design and not a change in scope so the additional costs will be participating. The INDOT PM is <br />aware of the change and has given concurrence. <br />Current Time Extension SS Days 0 SP Days 0 SP Days Value $ 0.00 <br />Previous Time Approved SS Days by AE:______ DCE:______ SCE:______ DDCM:______ <br />SS Days____________ SP Days Value $ _______________ <br />Revised Contract Time SS Completion Date 00/00/0000 or SS Calendar/Work Days 0 <br />SS Date 00/00/0000 or SP Days 0
The URL can be used to link to this page
Your browser does not support the video tag.