My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2. 1636 Lincoln Way West_COA 2022-0404
sbend
>
Public
>
Historic Preservation
>
2022
>
April
>
2. 1636 Lincoln Way West_COA 2022-0404
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2022 11:52:24 PM
Creation date
4/13/2022 11:33:48 PM
Metadata
Fields
Template:
South Bend HPC
HPC Street Address
1636 Lincoln Way West
HPC Document Type
Certification
HPC Local Landmark
i. South Bend
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Exhibit H 1632-1636 Lincolnway West <br />NSE Case History <br />Case Opened: 08/14/2018 <br />Case Transferred to Jason Miller: 9/27/19 <br />Hearings Held: <br /> 9/20/18 – Repair with deadline of 9/20/18 <br /> 2/26/19 – Demo modified to repair with deadline of 11/29/19 <br /> 1/14/20 – Repair with deadline of 6/19/20 <br /> 10/13/20 – Demo modified to repair with deadline of 11/13/20 <br />o Reverted to demolition after 11/13/20 deadline not met <br /> <br />Exterior Inspections: 48 inspections with photos since case opened <br /> <br />Demolition Overview <br /> <br />Once a property is found to be a risk to public safety, a property may be processed for demolition. <br /> <br />That process is as follows: <br /> Property owner letter - notify the owner of demolition <br /> Environmental Review Checklist completion (if applicable) <br /> Asbestos testing (if able) <br /> Request utilities be removed/retired for demolition <br /> Send demolition quote requests or go through Board of Public Works process (cost and size of <br />project dependent) <br /> Track quotes from contractors <br />o Lowest, responsible quote/bid will be awarded the project <br /> Notify contractors <br /> Send paperwork to winning contractor <br /> Assigned contractor takes over project and completes project in accordance with all specs, <br />local/state/federal regulations, insurance, licensure, notice requirements <br /> NSE monitor progress <br /> NSE verifies project is complete according to specs <br /> NSE receives and pays contractor’s invoice <br /> NSE invoices owner (all costs plus admin demolition fee) <br /> NSE may place a lien on the property for unpaid monies owed <br /> <br />At no time does the city own the property. <br />
The URL can be used to link to this page
Your browser does not support the video tag.