Laserfiche WebLink
ENG. 5 ENG. 4 ENG. 1 DES. 3 <br />212.75$ 182.47$ 115.68$ 114.27$ <br />Design Services <br />Expenses <br />Stage 1 Plans (25% Complete) <br />Task Description TotalSubconsultant <br />Prepare Techincal Inquiries (As Required) and Coordinate with INDOT TAC 4 2 4 1 1,792.93$ <br />Prepare and Submit Unique Special Provisions 2 4 888.22$ <br />Prepare Miscellaneous Stage 3 Submittal Documents 6 2 1,507.86$ <br />Prepare Quantity Calculations and Cost Estimate 1 4 645.19$ <br />QAQC 8 1,702.00$ <br />City of South Bend Submittal 2 425.50$ <br />Address City of South Bend Comments 1 1 2 2 855.12$ <br />INDOT Submittal via ERMS 2 425.50$ <br />Subtotal 30 16 70 19 -$ -$ 19,570.75$ <br />Address Stage 3 Comments 1 1 4 2 1,086.48$ <br />Finalize Plans 2 9 4 1,863.14$ <br />Finalize Unique Special Provisions 2 1 607.97$ <br />Finalize Quantities and Cost Estimate 1 2 413.83$ <br />Prepare Miscellaneous Final Tracings Submittal Documents 6 2 1,507.86$ <br />QAQC 8 1,702.00$ <br />City of South Bend Submittal 2 425.50$ <br />Address City of South Bend Comments 1 1 2 2 855.12$ <br />INDOT Submittal via ERMS 2 425.50$ <br />Subtotal 22 6 19 8 -$ -$ 8,887.40$ <br />Design Services Total 70 47 148 53 -$ 264.00$ 49,462.54$ <br />Total (Rounded)70.00 47.00 148.00 53.00 -$ 300.00$ 49,500.00$ <br />Final Tracings (100% Complete) <br />Page 6 of 9 3/31/2022