My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - SRTS Our Lady of Hungary Neighborhood Proj No. 122-007 - Shrewsberry & Assoc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2022
>
Agreements/Contracts/Proposals/Addenda
>
PSA - SRTS Our Lady of Hungary Neighborhood Proj No. 122-007 - Shrewsberry & Assoc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2022 4:05:55 PM
Creation date
4/12/2022 4:05:33 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
4/12/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of South Bend, Indiana <br />Our Lady of Hungary Safe Routes to School (Des. No. 2100025) <br />3/31/2022 <br />ENG. 5 ENG. 4 ENG. 1 DES. 3 <br />212.75$ 182.47$ 115.68$ 114.27$ <br />Preliminary Engineering Report <br />Kickoff Meeting (Virtual)3 638.25$ <br />Stakeholder Meeting to Identify Major Walking Routes (1 Maximum) 8 132$ 1,834.00$ <br />Subtotal 11 0 0 0 -$ 132.00$ 2,472.25$ <br />Assemble and Review Available Data 2 2 4 1,253.16$ <br />Identify and Review Design Criteria 1 2 577.69$ <br />Create Spreadsheet and Data Collection Forms 2 1 607.97$ <br />Perform Field Assessment of Major Walking Routes Identified at Stakeholder Meeting <br />(Approximately 25 Intersections/100 Existing Curb Ramps)4 2 20 732$ 4,261.54$ <br />Subtotal 9 7 24 0 -$ 732.00$ 6,700.36$ <br />Summarize Assumptions, Procedures, and Field Assessment. Photo-Document Findings.2 231.36$ <br />Identify Potential Improvements Along Major Walking Routes Identified at Stakeholder Meeting <br />(Approximately 25 Intersections/100 Existing Curb Ramps)2 6 1 1,636.00$ <br />Prepare Preliminary Construction Cost Estimates Along Major Walking Routes Identified at Stakeholder Meeting <br />(Approximately 25 Intersections/100 Existing Curb Ramps)2 1 6 1,302.05$ <br />Prioritize Improvements with City of South Bend Input 2 1 607.97$ <br />Develop Recommended List of Improvements within Construction Funding Amount 1 4 1 1,058.31$ <br />Prepare Draft Preliminary Engineering Report 4 2 12 2,604.10$ <br />Meet with South Bend to Review Preliminary Engineering Report (Virtual) 3 1 820.72$ <br />Finalize Preliminary Engineering Report 2 1 4 1,070.69$ <br />Subtotal 16 16 26 0 -$ -$ 9,331.20$ <br />Total 36 23 50 0 -$ 864.00$ 18,503.81$ <br />Total (Rounded)36.00 23.00 50.00 0.00 -$ 900.00$ 18,600.00$ <br />Data Collection/Field Assessment <br />Preliminary Engineering Report <br />Task Description TotalSubconsultant Expenses <br />Meetings <br />Page 2 of 9 3/31/2022
The URL can be used to link to this page
Your browser does not support the video tag.