Laserfiche WebLink
abatement procedure indicated above may be changed to liquid encapsulation instead of removal (in most cases, these items will be <br />covered with aluminum trim during the general construction phase). <br /> <br />The total estimated cost for the proposed work indicated above is $8,308.38. <br /> <br />A third-party clearance exam will be required upon completion of the abatement work. Greentree cannot perform this <br />clearance in accordance with HUD guidelines, but will hire a licensed third-party inspection company at an additional fee and <br />separate cost of $350.00 <br />*Removal and replacement is recommended for window sills as they are considered "chewable surfaces." <br /> <br />Please note: This estimate is only for abatement and clean-up to clearance levels or below. This is not a cosmetic improvement, but an <br />environmental hazard reduction activity. Though some cosmetic improvement may occur, this is not Greentree’s intended result. Our <br />purpose is to provide a safe, clean, green environment. All square footage is approximate. <br /> <br />Areas listed on the original inspection report as “negative” for lead-based paint will not be painted. Also, areas listed as “positive” <br />and “intact” will not be treated as they are in acceptable condition per HUD guidelines. Only the areas listed above will be treated <br />during this project. In addition, this estimate does not include inaccessible areas, which may be made accessible and tested at a later <br />time. <br /> <br />No contractor is to conduct work of any kind on this property until the lead -based paint stabilization or abatement work is complete as <br />their work may conflict with and jeopardize the clearance exam. Greentree reserves the right to stop work at any time if this <br />stipulation is violated. <br />